Hydro power plant, Washington
Twin Falls Hydro hydroelectric power plant, Washington
Twin Falls Hydro is a 24 MW hydro power plant in King County, Washington, operated by Central Rivers Power US, LLC, and it generated 59,297 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Washington, and its capacity factor sits at the 42nd percentile of U.S. hydro plants. By 2025 generation it ranks 3,881st of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Twin Falls Hydro plant run compared with other hydro plants?
The Twin Falls Hydro plant had a capacity factor of 30% in 2025 on 22.8 MW of net summer capacity, the 42nd percentile of the 427 U.S. hydro plants with at least 20 MW. The typical hydro plant reached 33%. That equals about 108 days at full output out of 365.
0%Shaded: the middle half of hydro plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Twin Falls Hydro | 30% |
| Hydro plants, 75th percentile | 44% |
| Hydro plants, median | 33% |
| Hydro plants, 25th percentile | 22% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Twin Falls Hydro plant generating more or less than last year?
Twin Falls Hydro generated 59,297 MWh in 2025; EIA reports no 2024 total to compare. 2024 has output for only 10 months, so the two years are not compared.
| Period | MWh |
|---|---|
| 2024 | 62,946 |
| 2025 | 59,297 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 10,917 |
| November 2025 | 8,907 |
| October 2025 | 1,301 |
| September 2025 | 0 |
| August 2025 | 0 |
| July 2025 | 0 |
| June 2025 | 2,239 |
| May 2025 | 8,154 |
| April 2025 | 9,809 |
| March 2025 | 9,132 |
| February 2025 | 3,909 |
| January 2025 | 4,929 |
| December 2024 | 8,241 |
| November 2024 | 7,253 |
| October 2024 | 917 |
| September 2024 | 0 |
| August 2024 | 0 |
| July 2024 | 584 |
| June 2024 | 8,167 |
| May 2024 | 9,971 |
| April 2024 | 7,558 |
| March 2024 | 7,108 |
| February 2024 | 6,810 |
| January 2024 | 6,337 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Twin Falls Hydro plant, and when do they retire?
2 operable generators total 24 MW, with an average age of 36 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 1980s | 2 | 24 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| UNI1 | Operating | Conventional Hydroelectric | 12 | 1989 | n/a |
| UNI2 | Operating | Conventional Hydroelectric | 12 | 1989 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Twin Falls Hydro plant?
3 owners report shares in Twin Falls Hydro; Central Rivers Power US, LLC holds the largest named share, 49.5% or about 11.9 MW. Central Rivers Power US, LLC operates the plant.
| Owner | Share | MW | 2025 MWh, by share |
|---|---|---|---|
| Central Rivers Power US, LLC | 49.5% | 12 | 29,352 |
| Enel North America, Inc. | 49.5% | 12 | 29,352 |
| South Fork Resources Inc | 1.0% | 0 | 593 |
Source: EIA Form EIA-860, Owner, 2025 final. MW and MWh by share multiply the plant totals by each owner's percentage.
Where is the Twin Falls Hydro plant?
Twin Falls Hydro is in North Bend, King County, Washington, at 47.4446° N, 121.6878° W. It sits in the Puget Sound Energy balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which hydro plants in Washington are similar in size?
Washington has 73 operable hydro plants with 21,462 MW of capacity, and Twin Falls Hydro's 24 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Cedar Falls (WA) | King | 30 | 53,629 |
| Packwood | Lewis | 28 | 73,848 |
| Main Canal Headworks | Grant | 27 | 105,240 |
| Twin Falls Hydro | King | 24 | 59,297 |
| Electron | Pierce | 23 | 0 |
| Upriver Dam Hydro Plant | Spokane | 18 | 39,873 |
| South Fork Tolt | King | 17 | 48,580 |
Source: EIA Forms EIA-860 and EIA-923, 2025.