Solar power plant, California
Lockheed Martin Palmdale Solar PV power plant, California
Lockheed Martin Palmdale Solar PV is a 20.9 MW solar power plant in Los Angeles County, California, operated by Lockheed Martin Corporation, and it generated 53,009 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 92nd percentile of U.S. solar plants. By 2025 generation it ranks 4,025th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Lockheed Martin Palmdale Solar PV plant run compared with other solar plants?
The Lockheed Martin Palmdale Solar PV plant had a capacity factor of 30% in 2025 on 20 MW of net summer capacity, the 92nd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 110 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Lockheed Martin Palmdale Solar PV | 30% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Lockheed Martin Palmdale Solar PV plant generating more or less than last year?
Lockheed Martin Palmdale Solar PV generated 53,009 MWh in 2025; EIA reports no 2024 total to compare.
| Period | MWh |
|---|---|
| 2024 | n/a |
| 2025 | 53,009 |
Monthly generation, Jan 2025 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 2,482 |
| November 2025 | 2,473 |
| October 2025 | 3,011 |
| September 2025 | 4,465 |
| August 2025 | 5,467 |
| July 2025 | 6,656 |
| June 2025 | 6,521 |
| May 2025 | 6,569 |
| April 2025 | 5,158 |
| March 2025 | 4,291 |
| February 2025 | 3,395 |
| January 2025 | 2,521 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Lockheed Martin Palmdale Solar PV plant, and when do they retire?
2 operable generators total 20.9 MW, with an average age of 3 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 1 | 4% | none reported |
| 2020s | 1 | 20 | 96% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 1MW | Operating | Solar Photovoltaic | 1 | 2016 | n/a |
| 20MW | Operating | Solar Photovoltaic | 20 | 2022 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Lockheed Martin Palmdale Solar PV plant?
EIA lists no joint owners for Lockheed Martin Palmdale Solar PV. Lockheed Martin Corporation operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Lockheed Martin Palmdale Solar PV plant?
Lockheed Martin Palmdale Solar PV is in Palmdale, Los Angeles County, California, at 34.6080° N, 118.1090° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and Lockheed Martin Palmdale Solar PV's 20.9 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Imperial Valley Solar Company 1 LLC | Imperial | 23 | 33,146 |
| San Joaquin Solar | Fresno | 21 | 22,393 |
| Solar Blythe LLC | Riverside | 21 | 38,787 |
| Lockheed Martin Palmdale Solar PV | Los Angeles | 21 | 53,009 |
| Atwell Island | Tulare | 20 | 33,929 |
| RE Garland A | Kern | 20 | 56,742 |
| Sunray 2 | San Bernardino | 20 | 54,600 |
Source: EIA Forms EIA-860 and EIA-923, 2025.