Solar power plant, California
San Joaquin Solar power plant, California
San Joaquin Solar is a 21.3 MW solar power plant in Fresno County, California, operated by Gasna 6p, LLC, and it generated 22,393 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 9th percentile of U.S. solar plants. By 2025 generation it ranks 5,114th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the San Joaquin Solar plant run compared with other solar plants?
The San Joaquin Solar plant had a capacity factor of 13% in 2025 on 20 MW of net summer capacity, the 9th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 47 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| San Joaquin Solar | 13% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the San Joaquin Solar plant generating more or less than last year?
Generation at San Joaquin Solar fell 8.7% from 2024 to 2025, from 24,540 MWh to 22,393 MWh.
| Period | MWh |
|---|---|
| 2024 | 24,540 |
| 2025 | 22,393 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 626 |
| November 2025 | 1,183 |
| October 2025 | 1,365 |
| September 2025 | 1,604 |
| August 2025 | 3,753 |
| July 2025 | 3,212 |
| June 2025 | 2,880 |
| May 2025 | 3,066 |
| April 2025 | 918 |
| March 2025 | 1,164 |
| February 2025 | 1,121 |
| January 2025 | 1,501 |
| December 2024 | 1,375 |
| November 2024 | 1,486 |
| October 2024 | 2,024 |
| September 2024 | 2,705 |
| August 2024 | 4,056 |
| July 2024 | 2,744 |
| June 2024 | 2,380 |
| May 2024 | 1,780 |
| April 2024 | 1,876 |
| March 2024 | 1,393 |
| February 2024 | 1,661 |
| January 2024 | 1,060 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the San Joaquin Solar plant, and when do they retire?
2 operable generators total 21.3 MW, with an average age of 7 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 2 | 21 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| SJ1A | Operating | Solar Photovoltaic | 20 | 2018 | n/a |
| SJ1B | Operating | Solar Photovoltaic | 2 | 2019 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the San Joaquin Solar plant?
EIA lists no joint owners for San Joaquin Solar. Gasna 6p, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the San Joaquin Solar plant?
San Joaquin Solar is in San Joaquin, Fresno County, California, at 36.5272° N, 120.1479° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and San Joaquin Solar's 21.3 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Vandenberg Solar Project | Santa Barbara | 25 | 39,494 |
| Axium Modesto Solar | Stanislaus | 25 | 53,191 |
| Imperial Valley Solar Company 1 LLC | Imperial | 23 | 33,146 |
| San Joaquin Solar | Fresno | 21 | 22,393 |
| Solar Blythe LLC | Riverside | 21 | 38,787 |
| Lockheed Martin Palmdale Solar PV | Los Angeles | 21 | 53,009 |
| Atwell Island | Tulare | 20 | 33,929 |
Source: EIA Forms EIA-860 and EIA-923, 2025.