Solar power plant, California
Vandenberg Solar Project, California
Vandenberg Solar Project is a 25.3 MW solar power plant in Santa Barbara County, California, operated by MN8 Energy LLC, and it generated 39,494 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 16th percentile of U.S. solar plants. By 2025 generation it ranks 4,381st of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Vandenberg Solar Project plant run compared with other solar plants?
The Vandenberg Solar Project plant had a capacity factor of 18% in 2025 on 25.3 MW of net summer capacity, the 16th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 65 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Vandenberg Solar Project | 18% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Vandenberg Solar Project plant generating more or less than last year?
Generation at Vandenberg Solar Project fell 0.6% from 2024 to 2025, from 39,736 MWh to 39,494 MWh.
| Period | MWh |
|---|---|
| 2024 | 39,736 |
| 2025 | 39,494 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 1,505 |
| November 2025 | 2,384 |
| October 2025 | 3,351 |
| September 2025 | 3,211 |
| August 2025 | 4,428 |
| July 2025 | 3,609 |
| June 2025 | 4,680 |
| May 2025 | 4,432 |
| April 2025 | 3,709 |
| March 2025 | 2,660 |
| February 2025 | 2,537 |
| January 2025 | 2,988 |
| December 2024 | 1,966 |
| November 2024 | 2,870 |
| October 2024 | 2,864 |
| September 2024 | 3,727 |
| August 2024 | 4,467 |
| July 2024 | 4,802 |
| June 2024 | 3,269 |
| May 2024 | 3,782 |
| April 2024 | 3,185 |
| March 2024 | 3,290 |
| February 2024 | 2,762 |
| January 2024 | 2,752 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Vandenberg Solar Project plant, and when do they retire?
1 operable generator totals 25.3 MW, with an average age of 8 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 25 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| VBERG | Operating | Solar Photovoltaic | 25 | 2017 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Vandenberg Solar Project plant?
Regions Bank is the only joint owner reported for Vandenberg Solar Project, with 100.0%. MN8 Energy LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Vandenberg Solar Project plant?
Vandenberg Solar Project is in Vandenberg Airforce B, Santa Barbara County, California, at 34.7497° N, 120.5100° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and Vandenberg Solar Project's 25.3 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Edwards Sanborn E3 | Kern | 27 | 57,391 |
| Hayworth Solar | Kern | 27 | 46,989 |
| Solar Borrego I | San Diego | 26 | 61,307 |
| Vandenberg Solar Project | Santa Barbara | 25 | 39,494 |
| Axium Modesto Solar | Stanislaus | 25 | 53,191 |
| Imperial Valley Solar Company 1 LLC | Imperial | 23 | 33,146 |
| San Joaquin Solar | Fresno | 21 | 22,393 |
Source: EIA Forms EIA-860 and EIA-923, 2025.