Edwards Sanborn E3 is a 38.1 MW power plant, 27.1 MW of it solar, in Kern County, California, operated by Terra-Gen Operating Co-Hybrid, and it generated 56,078 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 58th percentile of U.S. solar plants. By 2025 generation it ranks 3,946th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

38.1 MWNameplate capacity
24%Capacity factor, 2025, solar units, 58th percentile, on 27.1 MW net summer
3,946thU.S. rank by generation, 2025
4 yearsAverage generator age, by MW

How hard does the Edwards Sanborn E3 plant run compared with other solar plants?

The Edwards Sanborn E3 plant's solar units had a capacity factor of 24% in 2025 on 27.1 MW of net summer capacity, the 58th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 88 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Edwards Sanborn E324%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Edwards Sanborn E3 plant generating more or less than last year?

Generation at Edwards Sanborn E3 rose 11.2% from 2024 to 2025, from 50,444 MWh to 56,078 MWh. Through August 2026 it is running 3.9% ahead of the same months of 2025.

Net generation by period
PeriodMWh
202450,444
202556,078
2026 through August43,171
2025, same months41,552
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 20266,590
July 20265,700
June 20267,552
May 20267,257
April 20266,123
March 20263,987
February 20263,221
January 20262,741
December 20252,403
November 20252,480
October 20254,522
September 20255,121
August 20256,099
July 20257,306
June 20257,097
May 20256,484
April 20255,555
March 20253,542
February 20252,707
January 20252,762
December 20242,255
November 20242,672
October 20244,163
September 20244,893
August 20246,042
July 20246,621
June 20246,955
May 20245,258
April 20243,871
March 20242,840
February 20242,490
January 20242,384

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Edwards Sanborn E3 plant?

Edwards Sanborn E3 made 0.0% of the 204,542,898 MWh reported by California plants in 2025, from 0.0% of the state's 107,433 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 517th largest of 1,877 plants in California, the 4,166th largest of 14,327 in the U.S. and the 1,040th largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 419th largest of 1,608 generating plants in the state.

Edwards Sanborn E3 within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)38107,4330.0%
Generation (MWh)56,078204,542,8980.0%
Solar capacity (MW)2724,6630.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Edwards Sanborn E3 plant, and when do they retire?

2 operable generators total 38.1 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s238100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
BESSOperatingBatteries112021n/a
PVOperatingSolar Photovoltaic272021n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Edwards Sanborn E3 plant?

ES 1A Group 2 Opco, LLC is the only joint owner reported for Edwards Sanborn E3, with 100.0%. Terra-Gen Operating Co-Hybrid operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Edwards Sanborn E3 plant use?

Edwards Sanborn E3 has capacity on 2 fuels: 71% solar and 29% battery and pumped storage. In 2025, solar made 102% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar2771.1%57,391
Battery and pumped storage1128.9%-1,313

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Edwards Sanborn E3 plant?

Edwards Sanborn E3 is in Mojave, Kern County, California, at 34.9463° N, 118.1265° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Edwards Sanborn E3's 27.1 MW is 0% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
Midway Solar Farm IIImperial3036,099
Citizens Imperial SolarImperial3049,001
Chevron - Lost Hills HybridKern3065,771
Edwards Sanborn E3Kern2757,391
Hayworth SolarKern2746,989
Solar Borrego ISan Diego2661,307
Vandenberg Solar ProjectSanta Barbara2539,494