Solar power plant, California
Citizens Imperial Solar power plant, California
Citizens Imperial Solar is a 30 MW solar power plant in Imperial County, California, operated by Citizens Enterprises Corporation, and it generated 49,001 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 19th percentile of U.S. solar plants. By 2025 generation it ranks 4,121st of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Citizens Imperial Solar plant run compared with other solar plants?
The Citizens Imperial Solar plant had a capacity factor of 19% in 2025 on 30 MW of net summer capacity, the 19th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 68 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Citizens Imperial Solar | 19% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Citizens Imperial Solar plant generating more or less than last year?
Citizens Imperial Solar generated 49,001 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 52.7% ahead of the same months of 2025. 2024 has output for only 11 months, so the two years are not compared.
| Period | MWh |
|---|---|
| 2024 | 50,345 |
| 2025 | 49,001 |
| 2026 through August | 48,630 |
| 2025, same months | 31,854 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 5,924 |
| July 2026 | 6,326 |
| June 2026 | 7,369 |
| May 2026 | 8,020 |
| April 2026 | 6,859 |
| March 2026 | 6,090 |
| February 2026 | 4,421 |
| January 2026 | 3,621 |
| December 2025 | 3,435 |
| November 2025 | 3,809 |
| October 2025 | 5,606 |
| September 2025 | 4,297 |
| August 2025 | 3,665 |
| July 2025 | 5,027 |
| June 2025 | 5,727 |
| May 2025 | 5,274 |
| April 2025 | 4,249 |
| March 2025 | 3,124 |
| February 2025 | 2,520 |
| January 2025 | 2,268 |
| December 2024 | 1,313 |
| November 2024 | 0 |
| October 2024 | 2,836 |
| September 2024 | 3,989 |
| August 2024 | 5,969 |
| July 2024 | 6,214 |
| June 2024 | 6,793 |
| May 2024 | 6,876 |
| April 2024 | 6,000 |
| March 2024 | 4,252 |
| February 2024 | 3,149 |
| January 2024 | 2,954 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Citizens Imperial Solar plant, and when do they retire?
1 operable generator totals 30 MW, with an average age of 6 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 30 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| CIS1 | Operating | Solar Photovoltaic | 30 | 2019 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Citizens Imperial Solar plant?
Citizens Solar Holdings VIII, LLC is the only joint owner reported for Citizens Imperial Solar, with 100.0%. Citizens Enterprises Corporation operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Citizens Imperial Solar plant?
Citizens Imperial Solar is in Calipatria, Imperial County, California, at 33.1917° N, 115.4338° W. It sits in the Imperial Irrigation District balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and Citizens Imperial Solar's 30 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| P66 Rodeo Solar | Contra Costa | 30 | 36,993 |
| Seville 2 | Imperial | 30 | 78,279 |
| Midway Solar Farm II | Imperial | 30 | 36,099 |
| Citizens Imperial Solar | Imperial | 30 | 49,001 |
| Chevron - Lost Hills Hybrid | Kern | 30 | 65,771 |
| Edwards Sanborn E3 | Kern | 27 | 57,391 |
| Hayworth Solar | Kern | 27 | 46,989 |
Source: EIA Forms EIA-860 and EIA-923, 2025.