Solar power plant, California
Chevron-Lost Hills Hybrid solar power plant, California
Chevron-Lost Hills Hybrid is a 30 MW solar power plant in Kern County, California, operated by MN8 Energy LLC, and it generated 65,771 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 64th percentile of U.S. solar plants. By 2025 generation it ranks 3,805th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Chevron-Lost Hills Hybrid plant run compared with other solar plants?
The Chevron-Lost Hills Hybrid plant had a capacity factor of 25% in 2025 on 30 MW of net summer capacity, the 64th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 91 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Chevron-Lost Hills Hybrid | 25% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Chevron-Lost Hills Hybrid plant generating more or less than last year?
Generation at Chevron-Lost Hills Hybrid rose 1.3% from 2024 to 2025, from 64,913 MWh to 65,771 MWh. Through August 2026 it is running 6.1% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 64,913 |
| 2025 | 65,771 |
| 2026 through August | 48,693 |
| 2025, same months | 51,855 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 6,818 |
| July 2026 | 7,738 |
| June 2026 | 7,706 |
| May 2026 | 7,675 |
| April 2026 | 6,498 |
| March 2026 | 5,944 |
| February 2026 | 3,608 |
| January 2026 | 2,706 |
| December 2025 | 1,034 |
| November 2025 | 2,299 |
| October 2025 | 4,890 |
| September 2025 | 5,693 |
| August 2025 | 7,254 |
| July 2025 | 8,552 |
| June 2025 | 8,254 |
| May 2025 | 8,204 |
| April 2025 | 6,495 |
| March 2025 | 5,409 |
| February 2025 | 3,809 |
| January 2025 | 3,878 |
| December 2024 | 2,481 |
| November 2024 | 3,168 |
| October 2024 | 4,260 |
| September 2024 | 6,378 |
| August 2024 | 7,745 |
| July 2024 | 7,902 |
| June 2024 | 7,964 |
| May 2024 | 8,419 |
| April 2024 | 6,279 |
| March 2024 | 5,177 |
| February 2024 | 3,375 |
| January 2024 | 1,765 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Chevron-Lost Hills Hybrid plant, and when do they retire?
1 operable generator totals 30 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 30 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| GEN1 | Operating | Solar Photovoltaic | 30 | 2020 | n/a |
| BESS1 | Cancelled | Batteries | 10 | n/a | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Chevron-Lost Hills Hybrid plant?
EIA lists no joint owners for Chevron-Lost Hills Hybrid. MN8 Energy LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Chevron-Lost Hills Hybrid plant?
Chevron-Lost Hills Hybrid is in Lost Hills, Kern County, California, at 35.6200° N, 119.6900° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and Chevron-Lost Hills Hybrid's 30 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Seville 2 | Imperial | 30 | 78,279 |
| Midway Solar Farm II | Imperial | 30 | 36,099 |
| Citizens Imperial Solar | Imperial | 30 | 49,001 |
| Chevron - Lost Hills Hybrid | Kern | 30 | 65,771 |
| Edwards Sanborn E3 | Kern | 27 | 57,391 |
| Hayworth Solar | Kern | 27 | 46,989 |
| Solar Borrego I | San Diego | 26 | 61,307 |
Source: EIA Forms EIA-860 and EIA-923, 2025.