Skip to main content
RateWatt

Solar power plant, California

Chevron-Lost Hills Hybrid solar power plant, California

Chevron-Lost Hills Hybrid is a 30 MW solar power plant in Kern County, California, operated by MN8 Energy LLC, and it generated 65,771 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 64th percentile of U.S. solar plants. By 2025 generation it ranks 3,805th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

30 MWNameplate capacity
25%Capacity factor, 2025, 64th percentile, on 30 MW net summer
3,805thU.S. rank by generation, 2025
5 yearsAverage generator age, by MW

How hard does the Chevron-Lost Hills Hybrid plant run compared with other solar plants?

The Chevron-Lost Hills Hybrid plant had a capacity factor of 25% in 2025 on 30 MW of net summer capacity, the 64th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 91 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Chevron-Lost Hills Hybrid25%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Chevron-Lost Hills Hybrid plant generating more or less than last year?

Generation at Chevron-Lost Hills Hybrid rose 1.3% from 2024 to 2025, from 64,913 MWh to 65,771 MWh. Through August 2026 it is running 6.1% behind the same months of 2025.

Net generation by period
PeriodMWh
202464,913
202565,771
2026 through August48,693
2025, same months51,855
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 20266,818
July 20267,738
June 20267,706
May 20267,675
April 20266,498
March 20265,944
February 20263,608
January 20262,706
December 20251,034
November 20252,299
October 20254,890
September 20255,693
August 20257,254
July 20258,552
June 20258,254
May 20258,204
April 20256,495
March 20255,409
February 20253,809
January 20253,878
December 20242,481
November 20243,168
October 20244,260
September 20246,378
August 20247,745
July 20247,902
June 20247,964
May 20248,419
April 20246,279
March 20245,177
February 20243,375
January 20241,765

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Chevron-Lost Hills Hybrid plant?

Chevron-Lost Hills Hybrid made 0.0% of the 204,542,898 MWh reported by California plants in 2025, from 0.0% of the state's 107,433 MW of capacity. By capacity it is the 553rd largest of 1,877 plants in California, the 4,354th largest of 14,327 in the U.S. and the 1,028th largest of 7,223 solar plants. By 2025 generation it is the 400th largest of 1,608 generating plants in the state.

Chevron-Lost Hills Hybrid within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)30107,4330.0%
Generation (MWh)65,771204,542,8980.0%
Solar capacity (MW)3024,6630.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Chevron-Lost Hills Hybrid plant, and when do they retire?

1 operable generator totals 30 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s130100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GEN1OperatingSolar Photovoltaic302020n/a
BESS1CancelledBatteries10n/an/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Chevron-Lost Hills Hybrid plant?

EIA lists no joint owners for Chevron-Lost Hills Hybrid. MN8 Energy LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Chevron-Lost Hills Hybrid plant?

Chevron-Lost Hills Hybrid is in Lost Hills, Kern County, California, at 35.6200° N, 119.6900° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Chevron-Lost Hills Hybrid's 30 MW is 0% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
Seville 2Imperial3078,279
Midway Solar Farm IIImperial3036,099
Citizens Imperial SolarImperial3049,001
Chevron - Lost Hills HybridKern3065,771
Edwards Sanborn E3Kern2757,391
Hayworth SolarKern2746,989
Solar Borrego ISan Diego2661,307

Source: EIA Forms EIA-860 and EIA-923, 2025.