Solar power plant, California
Seville 2 solar power plant, California
Seville 2 is a 30 MW solar power plant in Imperial County, California, operated by Deriva Energy, and it generated 78,279 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 89th percentile of U.S. solar plants. By 2025 generation it ranks 3,663rd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Seville 2 plant run compared with other solar plants?
The Seville 2 plant had a capacity factor of 30% in 2025 on 30 MW of net summer capacity, the 89th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 109 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Seville 2 | 30% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Seville 2 plant generating more or less than last year?
Generation at Seville 2 rose 1.0% from 2024 to 2025, from 77,500 MWh to 78,279 MWh.
| Period | MWh |
|---|---|
| 2024 | 77,500 |
| 2025 | 78,279 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 3,682 |
| November 2025 | 4,226 |
| October 2025 | 6,269 |
| September 2025 | 5,869 |
| August 2025 | 8,236 |
| July 2025 | 9,241 |
| June 2025 | 9,574 |
| May 2025 | 8,592 |
| April 2025 | 8,208 |
| March 2025 | 5,602 |
| February 2025 | 4,313 |
| January 2025 | 4,467 |
| December 2024 | 3,712 |
| November 2024 | 4,674 |
| October 2024 | 6,103 |
| September 2024 | 6,776 |
| August 2024 | 7,430 |
| July 2024 | 8,220 |
| June 2024 | 9,086 |
| May 2024 | 8,932 |
| April 2024 | 8,324 |
| March 2024 | 6,083 |
| February 2024 | 4,467 |
| January 2024 | 3,693 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Seville 2 plant, and when do they retire?
1 operable generator totals 30 MW, with an average age of 10 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 30 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| SEV2 | Operating | Solar Photovoltaic | 30 | 2015 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Seville 2 plant?
Seville Solar Two, LLC is the only joint owner reported for Seville 2, with 100.0%. Deriva Energy operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Seville 2 plant?
Seville 2 is in Ocotillo Wells, Imperial County, California, at 33.1101° N, 116.0059° W. It sits in the Imperial Irrigation District balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and Seville 2's 30 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Edwards Sanborn S3 | Kern | 38 | 88,107 |
| Lost Hills/Blackwell | Kern | 32 | 58,861 |
| P66 Rodeo Solar | Contra Costa | 30 | 36,993 |
| Seville 2 | Imperial | 30 | 78,279 |
| Midway Solar Farm II | Imperial | 30 | 36,099 |
| Citizens Imperial Solar | Imperial | 30 | 49,001 |
| Chevron - Lost Hills Hybrid | Kern | 30 | 65,771 |
Source: EIA Forms EIA-860 and EIA-923, 2025.