Lost Hills/Blackwell is a 32 MW solar power plant in Kern County, California, operated by Southern Power Co, and it generated 58,861 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 32nd percentile of U.S. solar plants. By 2025 generation it ranks 3,891st of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

32 MWNameplate capacity
21%Capacity factor, 2025, 32nd percentile, on 32 MW net summer
3,891stU.S. rank by generation, 2025
10 yearsAverage generator age, by MW

How hard does the Lost Hills/Blackwell plant run compared with other solar plants?

The Lost Hills/Blackwell plant had a capacity factor of 21% in 2025 on 32 MW of net summer capacity, the 32nd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 77 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Lost Hills/Blackwell21%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Lost Hills/Blackwell plant generating more or less than last year?

Generation at Lost Hills/Blackwell fell 27.0% from 2024 to 2025, from 80,598 MWh to 58,861 MWh.

Net generation by period
PeriodMWh
202480,598
202558,861
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20251,676
November 20253,167
October 20254,544
September 20256,153
August 20258,083
July 20258,337
June 20257,300
May 20257,020
April 20253,339
March 20252,318
February 20252,958
January 20253,966
December 20242,373
November 20243,765
October 20245,628
September 20247,726
August 20249,722
July 202410,293
June 202410,483
May 20249,675
April 20247,758
March 20245,318
February 20244,704
January 20243,153

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Lost Hills/Blackwell plant?

Lost Hills/Blackwell made 0.0% of the 204,542,898 MWh reported by California plants in 2025, from 0.0% of the state's 107,433 MW of capacity. By capacity it is the 539th largest of 1,877 plants in California, the 4,301st largest of 14,327 in the U.S. and the 1,002nd largest of 7,223 solar plants. By 2025 generation it is the 410th largest of 1,608 generating plants in the state.

Lost Hills/Blackwell within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)32107,4330.0%
Generation (MWh)58,861204,542,8980.0%
Solar capacity (MW)3224,6630.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Lost Hills/Blackwell plant, and when do they retire?

2 operable generators total 32 MW, with an average age of 10 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s232100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
BLKWOperatingSolar Photovoltaic122015n/a
LTHLOperatingSolar Photovoltaic202015n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Lost Hills/Blackwell plant?

2 owners report shares in Lost Hills/Blackwell; Lost Hills Solar, LLC holds the largest named share, 62.5% or about 20 MW. Southern Power Co operates the plant.

Reported ownership of operable capacity
OwnerShareMW2025 MWh, by share
Lost Hills Solar, LLC62.5%2036,788
Blackwell Solar, LLC37.5%1222,073

Source: EIA Form EIA-860, Owner, 2025 final. MW and MWh by share multiply the plant totals by each owner's percentage.

Where is the Lost Hills/Blackwell plant?

Lost Hills/Blackwell is in Lost Hills, Kern County, California, at 35.6200° N, 119.8500° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Lost Hills/Blackwell's 32 MW is 0% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
Central 40Stanislaus4069,471
Beacon Solar Plant Site 5Kern3888,452
Edwards Sanborn S3Kern3888,107
Lost Hills/BlackwellKern3258,861
P66 Rodeo SolarContra Costa3036,993
Seville 2Imperial3078,279
Midway Solar Farm IIImperial3036,099

Source: EIA Forms EIA-860 and EIA-923, 2025.