Solar power plant, California

Midway Solar Farm II power plant, California

Midway Solar Farm II is a 30 MW solar power plant in Imperial County, California, operated by Dominion Renewable Energy, and it generated 36,099 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 10th percentile of U.S. solar plants. By 2025 generation it ranks 4,501st of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

30 MWNameplate capacity
14%Capacity factor, 2025, 10th percentile, on 30 MW net summer
4,501stU.S. rank by generation, 2025
8 yearsAverage generator age, by MW

How hard does the Midway Solar Farm II plant run compared with other solar plants?

The Midway Solar Farm II plant had a capacity factor of 14% in 2025 on 30 MW of net summer capacity, the 10th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 50 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Midway Solar Farm II14%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Midway Solar Farm II plant generating more or less than last year?

Generation at Midway Solar Farm II fell 37.3% from 2024 to 2025, from 57,617 MWh to 36,099 MWh. Through August 2026 it is running 18.1% ahead of the same months of 2025.

Net generation by period
PeriodMWh
202457,617
202536,099
2026 through August27,978
2025, same months23,681
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 20263,625
July 20260
June 20262,134
May 20265,532
April 20265,226
March 20264,983
February 20263,445
January 20263,033
December 20252,691
November 20252,777
October 20253,343
September 20253,607
August 20254,753
July 20252,992
June 20252,003
May 20253,027
April 20253,131
March 20253,010
February 20252,459
January 20252,306
December 20241,623
November 20242,154
October 20243,097
September 20243,194
August 20244,490
July 20246,084
June 20247,116
May 20248,238
April 20247,589
March 20245,890
February 20244,345
January 20243,797

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Midway Solar Farm II plant?

Midway Solar Farm II made 0.0% of the 204,542,898 MWh reported by California plants in 2025, from 0.0% of the state's 107,433 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 553rd largest of 1,877 plants in California, the 4,354th largest of 14,327 in the U.S. and the 1,021st largest of 7,223 solar plants. By 2025 generation it is the 552nd largest of 1,608 generating plants in the state.

Midway Solar Farm II within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)30107,4330.0%
Generation (MWh)36,099204,542,8980.0%
Solar capacity (MW)3024,6630.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Midway Solar Farm II plant, and when do they retire?

1 operable generator totals 30 MW, with an average age of 8 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s130100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
MSF2OperatingSolar Photovoltaic302017n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Midway Solar Farm II plant?

EIA lists no joint owners for Midway Solar Farm II. Dominion Renewable Energy operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Midway Solar Farm II plant?

Midway Solar Farm II is in Calipatria, Imperial County, California, at 33.1621° N, 115.5317° W. It sits in the Imperial Irrigation District balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Midway Solar Farm II's 30 MW is 0% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
Lost Hills/BlackwellKern3258,861
P66 Rodeo SolarContra Costa3036,993
Seville 2Imperial3078,279
Midway Solar Farm IIImperial3036,099
Citizens Imperial SolarImperial3049,001
Chevron - Lost Hills HybridKern3065,771
Edwards Sanborn E3Kern2757,391

Source: EIA Forms EIA-860 and EIA-923, 2025.