Solar power plant, California
P66 Rodeo Solar power plant, California
P66 Rodeo Solar is a 30.2 MW solar power plant in Contra Costa County, California, operated by P66 Rodeo Solar, and it generated 36,993 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 11th percentile of U.S. solar plants. By 2025 generation it ranks 4,466th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the P66 Rodeo Solar plant run compared with other solar plants?
The P66 Rodeo Solar plant had a capacity factor of 14% in 2025 on 30.2 MW of net summer capacity, the 11th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 51 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| P66 Rodeo Solar | 14% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the P66 Rodeo Solar plant generating more or less than last year?
P66 Rodeo Solar generated 36,993 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 112.4% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | n/a |
| 2025 | 36,993 |
| 2026 through August | 37,532 |
| 2025, same months | 17,669 |
Monthly generation, Apr 2025 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 5,351 |
| July 2026 | 5,545 |
| June 2026 | 5,645 |
| May 2026 | 5,285 |
| April 2026 | 4,617 |
| March 2026 | 5,212 |
| February 2026 | 3,009 |
| January 2026 | 2,868 |
| December 2025 | 1,701 |
| November 2025 | 2,335 |
| October 2025 | 3,834 |
| September 2025 | 11,454 |
| August 2025 | 5,627 |
| July 2025 | 5,919 |
| June 2025 | 6,123 |
| May 2025 | 0 |
| April 2025 | 0 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the P66 Rodeo Solar plant, and when do they retire?
1 operable generator totals 30.2 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 30 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| P66RS | Operating | Solar Photovoltaic | 30 | 2023 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the P66 Rodeo Solar plant?
EIA lists no joint owners for P66 Rodeo Solar. P66 Rodeo Solar operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the P66 Rodeo Solar plant?
P66 Rodeo Solar is in Rodeo, Contra Costa County, California, at 38.0350° N, 122.2470° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and P66 Rodeo Solar's 30.2 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Beacon Solar Plant Site 5 | Kern | 38 | 88,452 |
| Edwards Sanborn S3 | Kern | 38 | 88,107 |
| Lost Hills/Blackwell | Kern | 32 | 58,861 |
| P66 Rodeo Solar | Contra Costa | 30 | 36,993 |
| Seville 2 | Imperial | 30 | 78,279 |
| Midway Solar Farm II | Imperial | 30 | 36,099 |
| Citizens Imperial Solar | Imperial | 30 | 49,001 |
Source: EIA Forms EIA-860 and EIA-923, 2025.