P66 Rodeo Solar power plant, California

P66 Rodeo Solar is a 30.2 MW solar power plant in Contra Costa County, California, operated by P66 Rodeo Solar, and it generated 36,993 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 11th percentile of U.S. solar plants. By 2025 generation it ranks 4,466th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

30.2 MWNameplate capacity
14%Capacity factor, 2025, 11th percentile, on 30.2 MW net summer
4,466thU.S. rank by generation, 2025
2 yearsAverage generator age, by MW

How hard does the P66 Rodeo Solar plant run compared with other solar plants?

The P66 Rodeo Solar plant had a capacity factor of 14% in 2025 on 30.2 MW of net summer capacity, the 11th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 51 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
P66 Rodeo Solar14%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the P66 Rodeo Solar plant generating more or less than last year?

P66 Rodeo Solar generated 36,993 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 112.4% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024n/a
202536,993
2026 through August37,532
2025, same months17,669
Monthly generation, Apr 2025 to Aug 2026
MonthMWh
August 20265,351
July 20265,545
June 20265,645
May 20265,285
April 20264,617
March 20265,212
February 20263,009
January 20262,868
December 20251,701
November 20252,335
October 20253,834
September 202511,454
August 20255,627
July 20255,919
June 20256,123
May 20250
April 20250

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the P66 Rodeo Solar plant?

P66 Rodeo Solar made 0.0% of the 204,542,898 MWh reported by California plants in 2025, from 0.0% of the state's 107,433 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 551st largest of 1,877 plants in California, the 4,348th largest of 14,327 in the U.S. and the 1,011th largest of 7,223 solar plants. By 2025 generation it is the 542nd largest of 1,608 generating plants in the state.

P66 Rodeo Solar within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)30107,4330.0%
Generation (MWh)36,993204,542,8980.0%
Solar capacity (MW)3024,6630.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the P66 Rodeo Solar plant, and when do they retire?

1 operable generator totals 30.2 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s130100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
P66RSOperatingSolar Photovoltaic302023n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the P66 Rodeo Solar plant?

EIA lists no joint owners for P66 Rodeo Solar. P66 Rodeo Solar operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the P66 Rodeo Solar plant?

P66 Rodeo Solar is in Rodeo, Contra Costa County, California, at 38.0350° N, 122.2470° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and P66 Rodeo Solar's 30.2 MW is 0% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
Beacon Solar Plant Site 5Kern3888,452
Edwards Sanborn S3Kern3888,107
Lost Hills/BlackwellKern3258,861
P66 Rodeo SolarContra Costa3036,993
Seville 2Imperial3078,279
Midway Solar Farm IIImperial3036,099
Citizens Imperial SolarImperial3049,001

Source: EIA Forms EIA-860 and EIA-923, 2025.