Solar power plant, California
Edwards Sanborn S3 solar power plant, California
Edwards Sanborn S3 is a 70.7 MW power plant, 37.7 MW of it solar, in Kern County, California, operated by Terra-Gen Operating Co-Hybrid, and it generated 83,773 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 76th percentile of U.S. solar plants. By 2025 generation it ranks 3,599th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Edwards Sanborn S3 plant run compared with other solar plants?
The Edwards Sanborn S3 plant's solar units had a capacity factor of 27% in 2025 on 37.7 MW of net summer capacity, the 76th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 97 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Edwards Sanborn S3 | 27% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.
Is the Edwards Sanborn S3 plant generating more or less than last year?
Generation at Edwards Sanborn S3 rose 5.2% from 2024 to 2025, from 79,659 MWh to 83,773 MWh. Through August 2026 it is running 6.1% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 79,659 |
| 2025 | 83,773 |
| 2026 through August | 57,874 |
| 2025, same months | 61,613 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 8,930 |
| July 2026 | 9,079 |
| June 2026 | 10,340 |
| May 2026 | 8,527 |
| April 2026 | 6,039 |
| March 2026 | 6,537 |
| February 2026 | 4,401 |
| January 2026 | 4,021 |
| December 2025 | 3,575 |
| November 2025 | 3,937 |
| October 2025 | 6,905 |
| September 2025 | 7,743 |
| August 2025 | 9,194 |
| July 2025 | 10,400 |
| June 2025 | 9,788 |
| May 2025 | 9,458 |
| April 2025 | 8,662 |
| March 2025 | 4,977 |
| February 2025 | 4,637 |
| January 2025 | 4,497 |
| December 2024 | 3,283 |
| November 2024 | 4,442 |
| October 2024 | 6,287 |
| September 2024 | 7,484 |
| August 2024 | 9,017 |
| July 2024 | 9,621 |
| June 2024 | 9,806 |
| May 2024 | 9,592 |
| April 2024 | 7,814 |
| March 2024 | 4,597 |
| February 2024 | 4,189 |
| January 2024 | 3,527 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Edwards Sanborn S3 plant, and when do they retire?
2 operable generators total 70.7 MW, with an average age of 3 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 2 | 71 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| BESS | Operating | Batteries | 33 | 2022 | n/a |
| PV | Operating | Solar Photovoltaic | 38 | 2022 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Edwards Sanborn S3 plant?
ES 1A Group 2 Opco, LLC is the only joint owner reported for Edwards Sanborn S3, with 100.0%. Terra-Gen Operating Co-Hybrid operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What fuels does the Edwards Sanborn S3 plant use?
Edwards Sanborn S3 has capacity on 2 fuels: 53% solar and 47% battery and pumped storage. In 2025, solar made 105% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Solar | 38 | 53.3% | 88,107 |
| Battery and pumped storage | 33 | 46.7% | -4,334 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the Edwards Sanborn S3 plant?
Edwards Sanborn S3 is in Mojave, Kern County, California, at 35.0164° N, 118.1225° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and Edwards Sanborn S3's 37.7 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Cuyama Solar, LLC | Santa Barbara | 40 | 63,174 |
| Central 40 | Stanislaus | 40 | 69,471 |
| Beacon Solar Plant Site 5 | Kern | 38 | 88,452 |
| Edwards Sanborn S3 | Kern | 38 | 88,107 |
| Lost Hills/Blackwell | Kern | 32 | 58,861 |
| P66 Rodeo Solar | Contra Costa | 30 | 36,993 |
| Seville 2 | Imperial | 30 | 78,279 |
Source: EIA Forms EIA-860 and EIA-923, 2025.