Solar power plant, California
Cuyama Solar, LLC power plant, California
Cuyama Solar, LLC is a 40 MW solar power plant in Santa Barbara County, California, operated by Cuyama Solar, LLC, and it generated 63,174 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 17th percentile of U.S. solar plants. By 2025 generation it ranks 3,835th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Cuyama Solar, LLC plant run compared with other solar plants?
The Cuyama Solar, LLC plant had a capacity factor of 18% in 2025 on 40 MW of net summer capacity, the 17th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 66 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Cuyama Solar, LLC | 18% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Cuyama Solar, LLC plant generating more or less than last year?
Generation at Cuyama Solar, LLC fell 5.4% from 2024 to 2025, from 66,758 MWh to 63,174 MWh. Through August 2026 it is running 4.1% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 66,758 |
| 2025 | 63,174 |
| 2026 through August | 39,348 |
| 2025, same months | 41,020 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 6,083 |
| July 2026 | 7,677 |
| June 2026 | 6,869 |
| May 2026 | 2,539 |
| April 2026 | 1,856 |
| March 2026 | 4,888 |
| February 2026 | 3,814 |
| January 2026 | 5,622 |
| December 2025 | 4,953 |
| November 2025 | 5,293 |
| October 2025 | 5,607 |
| September 2025 | 6,301 |
| August 2025 | 7,902 |
| July 2025 | 5,683 |
| June 2025 | 4,889 |
| May 2025 | 7,090 |
| April 2025 | 4,085 |
| March 2025 | 3,233 |
| February 2025 | 2,596 |
| January 2025 | 5,542 |
| December 2024 | 4,272 |
| November 2024 | 3,630 |
| October 2024 | 2,277 |
| September 2024 | 6,822 |
| August 2024 | 7,356 |
| July 2024 | 8,706 |
| June 2024 | 3,498 |
| May 2024 | 7,450 |
| April 2024 | 5,575 |
| March 2024 | 6,421 |
| February 2024 | 5,889 |
| January 2024 | 4,862 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Cuyama Solar, LLC plant, and when do they retire?
1 operable generator totals 40 MW, with an average age of 8 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 40 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| GEN01 | Operating | Solar Photovoltaic | 40 | 2017 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Cuyama Solar, LLC plant?
EIA lists no joint owners for Cuyama Solar, LLC. Cuyama Solar, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Cuyama Solar, LLC plant?
Cuyama Solar, LLC is in Cuyama, Santa Barbara County, California, at 34.9010° N, 119.5960° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and Cuyama Solar, LLC's 40 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Edwards Sanborn S4 | Kern | 41 | 89,359 |
| Little Bear Solar 1, LLC | Fresno | 40 | 62,993 |
| Elevation Solar C | Los Angeles | 40 | 102,483 |
| Cuyama Solar, LLC | Santa Barbara | 40 | 63,174 |
| Central 40 | Stanislaus | 40 | 69,471 |
| Beacon Solar Plant Site 5 | Kern | 38 | 88,452 |
| Edwards Sanborn S3 | Kern | 38 | 88,107 |
Source: EIA Forms EIA-860 and EIA-923, 2025.