Skip to main content
RateWatt

Solar power plant, California

Edwards Sanborn S4 solar power plant, California

Edwards Sanborn S4 is a 60 MW power plant, 41.2 MW of it solar, in Kern County, California, operated by Terra-Gen Operating Co-Hybrid, and it generated 88,865 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 63rd percentile of U.S. solar plants. By 2025 generation it ranks 3,527th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

60 MWNameplate capacity
25%Capacity factor, 2025, solar units, 63rd percentile, on 41.2 MW net summer
3,527thU.S. rank by generation, 2025
3 yearsAverage generator age, by MW

How hard does the Edwards Sanborn S4 plant run compared with other solar plants?

The Edwards Sanborn S4 plant's solar units had a capacity factor of 25% in 2025 on 41.2 MW of net summer capacity, the 63rd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 90 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Edwards Sanborn S425%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Edwards Sanborn S4 plant generating more or less than last year?

Generation at Edwards Sanborn S4 rose 22.7% from 2024 to 2025, from 72,407 MWh to 88,865 MWh. Through August 2026 it is running 7.0% ahead of the same months of 2025.

Net generation by period
PeriodMWh
202472,407
202588,865
2026 through August70,465
2025, same months65,854
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 20269,965
July 202610,377
June 202611,493
May 202611,192
April 20269,817
March 20268,171
February 20265,160
January 20264,290
December 20252,531
November 20254,118
October 20257,828
September 20258,534
August 202510,275
July 202510,885
June 202510,217
May 202510,314
April 20259,200
March 20256,438
February 20253,911
January 20254,614
December 20243,313
November 20244,052
October 20246,472
September 20247,696
August 20248,787
July 20249,704
June 20249,372
May 20247,670
April 20245,117
March 20243,334
February 20244,079
January 20242,811

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Edwards Sanborn S4 plant?

Edwards Sanborn S4 made 0.0% of the 204,542,898 MWh reported by California plants in 2025, from 0.1% of the state's 107,433 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 378th largest of 1,877 plants in California, the 3,517th largest of 14,327 in the U.S. and the 958th largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 362nd largest of 1,608 generating plants in the state.

Edwards Sanborn S4 within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)60107,4330.1%
Generation (MWh)88,865204,542,8980.0%
Solar capacity (MW)4124,6630.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Edwards Sanborn S4 plant, and when do they retire?

2 operable generators total 60 MW, with an average age of 3 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s260100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
PVOperatingSolar Photovoltaic412022n/a
BESSOperatingBatteries192023n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Edwards Sanborn S4 plant?

EdSan 1B Group 1 Sanborn, LLC is the only joint owner reported for Edwards Sanborn S4, with 100.0%. Terra-Gen Operating Co-Hybrid operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Edwards Sanborn S4 plant use?

Edwards Sanborn S4 has capacity on 2 fuels: 69% solar and 31% battery and pumped storage. In 2025, solar made 101% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar4168.7%89,359
Battery and pumped storage1931.3%-494

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Edwards Sanborn S4 plant?

Edwards Sanborn S4 is in Mojave, Kern County, California, at 35.0125° N, 118.1193° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Edwards Sanborn S4's 41.2 MW is 0% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
Edwards Sanborn S1Kern45103,431
Camino Solar HybridKern44104,804
Arrowleaf Solar and StorageImperial42730
Edwards Sanborn S4Kern4189,359
Little Bear Solar 1, LLCFresno4062,993
Elevation Solar CLos Angeles40102,483
Cuyama Solar, LLCSanta Barbara4063,174

Source: EIA Forms EIA-860 and EIA-923, 2025.