Solar power plant, California

Camino Solar Hybrid power plant, California

Camino Solar Hybrid is a 44 MW solar power plant in Kern County, California, operated by Avangrid Power LLC, and it generated 104,804 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in California, and its capacity factor sits at the 78th percentile of U.S. solar plants. By 2025 generation it ranks 3,341st of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

44 MWNameplate capacity
27%Capacity factor, 2025, 78th percentile, on 44 MW net summer
0.1%Of CA generation, 2025
Under 1 yearAverage generator age, by MW

How hard does the Camino Solar Hybrid plant run compared with other solar plants?

The Camino Solar Hybrid plant had a capacity factor of 27% in 2025 on 44 MW of net summer capacity, the 78th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 99 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Camino Solar Hybrid27%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Camino Solar Hybrid plant generating more or less than last year?

Camino Solar Hybrid generated 104,804 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 42.8% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024n/a
2025104,804
2026 through August98,284
2025, same months68,845
Monthly generation, Apr 2025 to Aug 2026
MonthMWh
August 202613,740
July 202614,308
June 202615,391
May 202614,742
April 202612,120
March 202612,377
February 20268,270
January 20267,336
December 20256,787
November 20256,777
October 202511,032
September 202511,363
August 202513,541
July 202514,618
June 202514,160
May 202514,545
April 202511,981

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Camino Solar Hybrid plant?

Camino Solar Hybrid made 0.1% of the 204,542,898 MWh reported by California plants in 2025, from 0.0% of the state's 107,433 MW of capacity. Its share of output is 1.3 times its share of capacity. By capacity it is the 488th largest of 1,877 plants in California, the 3,998th largest of 14,327 in the U.S. and the 953rd largest of 7,223 solar plants. By 2025 generation it is the 349th largest of 1,608 generating plants in the state.

Camino Solar Hybrid within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)44107,4330.0%
Generation (MWh)104,804204,542,8980.1%
Solar capacity (MW)4424,6630.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Camino Solar Hybrid plant, and when do they retire?

1 operable generator totals 44 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s144100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
CSPV1OperatingSolar Photovoltaic442025n/a
CSBA1CancelledBatteries11n/an/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Camino Solar Hybrid plant?

EIA lists no joint owners for Camino Solar Hybrid. Avangrid Power LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Camino Solar Hybrid plant?

Camino Solar Hybrid is in Rosamond, Kern County, California, at 34.9303° N, 118.4432° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Camino Solar Hybrid's 44 MW is 0% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
RE Camelot LLCKern45121,010
RE Gaskell West 2 LLCKern45111,461
Edwards Sanborn S1Kern45103,431
Camino Solar HybridKern44104,804
Arrowleaf Solar and StorageImperial42730
Edwards Sanborn S4Kern4189,359
Little Bear Solar 1, LLCFresno4062,993

Source: EIA Forms EIA-860 and EIA-923, 2025.