Solar power plant, California
Camino Solar Hybrid power plant, California
Camino Solar Hybrid is a 44 MW solar power plant in Kern County, California, operated by Avangrid Power LLC, and it generated 104,804 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in California, and its capacity factor sits at the 78th percentile of U.S. solar plants. By 2025 generation it ranks 3,341st of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Camino Solar Hybrid plant run compared with other solar plants?
The Camino Solar Hybrid plant had a capacity factor of 27% in 2025 on 44 MW of net summer capacity, the 78th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 99 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Camino Solar Hybrid | 27% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Camino Solar Hybrid plant generating more or less than last year?
Camino Solar Hybrid generated 104,804 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 42.8% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | n/a |
| 2025 | 104,804 |
| 2026 through August | 98,284 |
| 2025, same months | 68,845 |
Monthly generation, Apr 2025 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 13,740 |
| July 2026 | 14,308 |
| June 2026 | 15,391 |
| May 2026 | 14,742 |
| April 2026 | 12,120 |
| March 2026 | 12,377 |
| February 2026 | 8,270 |
| January 2026 | 7,336 |
| December 2025 | 6,787 |
| November 2025 | 6,777 |
| October 2025 | 11,032 |
| September 2025 | 11,363 |
| August 2025 | 13,541 |
| July 2025 | 14,618 |
| June 2025 | 14,160 |
| May 2025 | 14,545 |
| April 2025 | 11,981 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Camino Solar Hybrid plant, and when do they retire?
1 operable generator totals 44 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 44 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| CSPV1 | Operating | Solar Photovoltaic | 44 | 2025 | n/a |
| CSBA1 | Cancelled | Batteries | 11 | n/a | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Camino Solar Hybrid plant?
EIA lists no joint owners for Camino Solar Hybrid. Avangrid Power LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Camino Solar Hybrid plant?
Camino Solar Hybrid is in Rosamond, Kern County, California, at 34.9303° N, 118.4432° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and Camino Solar Hybrid's 44 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| RE Camelot LLC | Kern | 45 | 121,010 |
| RE Gaskell West 2 LLC | Kern | 45 | 111,461 |
| Edwards Sanborn S1 | Kern | 45 | 103,431 |
| Camino Solar Hybrid | Kern | 44 | 104,804 |
| Arrowleaf Solar and Storage | Imperial | 42 | 730 |
| Edwards Sanborn S4 | Kern | 41 | 89,359 |
| Little Bear Solar 1, LLC | Fresno | 40 | 62,993 |
Source: EIA Forms EIA-860 and EIA-923, 2025.