Solar power plant, California
Little Bear Solar 1, LLC power plant, California
Little Bear Solar 1, LLC is a 40 MW solar power plant in Fresno County, California, operated by Little Bear Solar 1, LLC (Longroad), and it generated 62,993 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 17th percentile of U.S. solar plants. By 2025 generation it ranks 3,837th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Little Bear Solar 1, LLC plant run compared with other solar plants?
The Little Bear Solar 1, LLC plant had a capacity factor of 18% in 2025 on 40 MW of net summer capacity, the 17th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 66 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Little Bear Solar 1, LLC | 18% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Little Bear Solar 1, LLC plant generating more or less than last year?
Generation at Little Bear Solar 1, LLC fell 23.4% from 2024 to 2025, from 82,204 MWh to 62,993 MWh. Through August 2026 it is running 20.2% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 82,204 |
| 2025 | 62,993 |
| 2026 through August | 60,932 |
| 2025, same months | 50,675 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 9,444 |
| July 2026 | 10,179 |
| June 2026 | 11,182 |
| May 2026 | 7,760 |
| April 2026 | 4,754 |
| March 2026 | 8,650 |
| February 2026 | 5,293 |
| January 2026 | 3,670 |
| December 2025 | 1,648 |
| November 2025 | 3,672 |
| October 2025 | 2,677 |
| September 2025 | 4,321 |
| August 2025 | 6,746 |
| July 2025 | 7,300 |
| June 2025 | 7,422 |
| May 2025 | 7,500 |
| April 2025 | 3,723 |
| March 2025 | 6,353 |
| February 2025 | 5,807 |
| January 2025 | 5,824 |
| December 2024 | 3,492 |
| November 2024 | 5,279 |
| October 2024 | 7,875 |
| September 2024 | 9,081 |
| August 2024 | 10,190 |
| July 2024 | 12,607 |
| June 2024 | 10,921 |
| May 2024 | 6,479 |
| April 2024 | 3,307 |
| March 2024 | 4,403 |
| February 2024 | 4,893 |
| January 2024 | 3,677 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Little Bear Solar 1, LLC plant, and when do they retire?
1 operable generator totals 40 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 40 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| GEN01 | Operating | Solar Photovoltaic | 40 | 2020 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Little Bear Solar 1, LLC plant?
EIA lists no joint owners for Little Bear Solar 1, LLC. Little Bear Solar 1, LLC (Longroad) operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Little Bear Solar 1, LLC plant?
Little Bear Solar 1, LLC is in Mendota, Fresno County, California, at 36.7160° N, 120.4150° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and Little Bear Solar 1, LLC's 40 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Camino Solar Hybrid | Kern | 44 | 104,804 |
| Arrowleaf Solar and Storage | Imperial | 42 | 730 |
| Edwards Sanborn S4 | Kern | 41 | 89,359 |
| Little Bear Solar 1, LLC | Fresno | 40 | 62,993 |
| Elevation Solar C | Los Angeles | 40 | 102,483 |
| Cuyama Solar, LLC | Santa Barbara | 40 | 63,174 |
| Central 40 | Stanislaus | 40 | 69,471 |
Source: EIA Forms EIA-860 and EIA-923, 2025.