Solar power plant, California
Elevation Solar C power plant, California
Elevation Solar C is a 40 MW solar power plant in Los Angeles County, California, operated by AES Distributed Energy, and it generated 102,483 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in California, and its capacity factor sits at the 90th percentile of U.S. solar plants. By 2025 generation it ranks 3,367th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Elevation Solar C plant run compared with other solar plants?
The Elevation Solar C plant had a capacity factor of 30% in 2025 on 39 MW of net summer capacity, the 90th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 109 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Elevation Solar C | 30% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Elevation Solar C plant generating more or less than last year?
Generation at Elevation Solar C rose 2.6% from 2024 to 2025, from 99,880 MWh to 102,483 MWh. Through August 2026 it is running 3.3% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 99,880 |
| 2025 | 102,483 |
| 2026 through August | 77,594 |
| 2025, same months | 75,126 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 10,582 |
| July 2026 | 11,185 |
| June 2026 | 12,251 |
| May 2026 | 12,201 |
| April 2026 | 10,410 |
| March 2026 | 9,313 |
| February 2026 | 6,136 |
| January 2026 | 5,516 |
| December 2025 | 5,152 |
| November 2025 | 5,073 |
| October 2025 | 8,116 |
| September 2025 | 9,016 |
| August 2025 | 10,932 |
| July 2025 | 12,856 |
| June 2025 | 12,330 |
| May 2025 | 11,587 |
| April 2025 | 9,242 |
| March 2025 | 5,325 |
| February 2025 | 6,614 |
| January 2025 | 6,240 |
| December 2024 | 5,153 |
| November 2024 | 5,853 |
| October 2024 | 8,074 |
| September 2024 | 9,411 |
| August 2024 | 11,214 |
| July 2024 | 11,288 |
| June 2024 | 11,503 |
| May 2024 | 10,465 |
| April 2024 | 8,647 |
| March 2024 | 7,480 |
| February 2024 | 5,631 |
| January 2024 | 5,161 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Elevation Solar C plant, and when do they retire?
1 operable generator totals 40 MW, with an average age of 9 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 40 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| ELVSC | Operating | Solar Photovoltaic | 40 | 2016 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Elevation Solar C plant?
Elevation Solar C is the only joint owner reported for Elevation Solar C, with 100.0%. AES Distributed Energy operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Elevation Solar C plant?
Elevation Solar C is in Lancaster, Los Angeles County, California, at 34.7303° N, 118.3042° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and Elevation Solar C's 40 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Arrowleaf Solar and Storage | Imperial | 42 | 730 |
| Edwards Sanborn S4 | Kern | 41 | 89,359 |
| Little Bear Solar 1, LLC | Fresno | 40 | 62,993 |
| Elevation Solar C | Los Angeles | 40 | 102,483 |
| Cuyama Solar, LLC | Santa Barbara | 40 | 63,174 |
| Central 40 | Stanislaus | 40 | 69,471 |
| Beacon Solar Plant Site 5 | Kern | 38 | 88,452 |
Source: EIA Forms EIA-860 and EIA-923, 2025.