Solar power plant, California
Edwards Sanborn S1 solar power plant, California
Edwards Sanborn S1 is a 84.6 MW power plant, 44.6 MW of it solar, in Kern County, California, operated by Terra-Gen Operating Co-Hybrid, and it generated 100,535 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 74th percentile of U.S. solar plants. By 2025 generation it ranks 3,385th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Edwards Sanborn S1 plant run compared with other solar plants?
The Edwards Sanborn S1 plant's solar units had a capacity factor of 26% in 2025 on 44.6 MW of net summer capacity, the 74th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 97 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Edwards Sanborn S1 | 26% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.
Is the Edwards Sanborn S1 plant generating more or less than last year?
Generation at Edwards Sanborn S1 rose 8.8% from 2024 to 2025, from 92,378 MWh to 100,535 MWh. Through August 2026 it is running 8.9% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 92,378 |
| 2025 | 100,535 |
| 2026 through August | 67,050 |
| 2025, same months | 73,610 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 10,655 |
| July 2026 | 10,294 |
| June 2026 | 12,269 |
| May 2026 | 9,678 |
| April 2026 | 6,769 |
| March 2026 | 7,422 |
| February 2026 | 5,190 |
| January 2026 | 4,773 |
| December 2025 | 4,450 |
| November 2025 | 4,795 |
| October 2025 | 8,343 |
| September 2025 | 9,337 |
| August 2025 | 11,166 |
| July 2025 | 12,515 |
| June 2025 | 11,653 |
| May 2025 | 11,806 |
| April 2025 | 10,042 |
| March 2025 | 5,833 |
| February 2025 | 5,272 |
| January 2025 | 5,323 |
| December 2024 | 4,021 |
| November 2024 | 5,254 |
| October 2024 | 7,379 |
| September 2024 | 8,765 |
| August 2024 | 10,481 |
| July 2024 | 11,125 |
| June 2024 | 10,914 |
| May 2024 | 10,346 |
| April 2024 | 8,055 |
| March 2024 | 6,353 |
| February 2024 | 5,333 |
| January 2024 | 4,352 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Edwards Sanborn S1 plant, and when do they retire?
2 operable generators total 84.6 MW, with an average age of 3 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 2 | 85 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| BESS | Operating | Batteries | 40 | 2022 | n/a |
| PV | Operating | Solar Photovoltaic | 45 | 2022 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Edwards Sanborn S1 plant?
ES 1A Group 2 Opco, LLC is the only joint owner reported for Edwards Sanborn S1, with 100.0%. Terra-Gen Operating Co-Hybrid operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What fuels does the Edwards Sanborn S1 plant use?
Edwards Sanborn S1 has capacity on 2 fuels: 53% solar and 47% battery and pumped storage. In 2025, solar made 103% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Solar | 45 | 52.7% | 103,431 |
| Battery and pumped storage | 40 | 47.3% | -2,896 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the Edwards Sanborn S1 plant?
Edwards Sanborn S1 is in Mojave, Kern County, California, at 35.0277° N, 118.1328° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and Edwards Sanborn S1's 44.6 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Beacon Solar Plant Site 2 | Kern | 47 | 112,294 |
| RE Camelot LLC | Kern | 45 | 121,010 |
| RE Gaskell West 2 LLC | Kern | 45 | 111,461 |
| Edwards Sanborn S1 | Kern | 45 | 103,431 |
| Camino Solar Hybrid | Kern | 44 | 104,804 |
| Arrowleaf Solar and Storage | Imperial | 42 | 730 |
| Edwards Sanborn S4 | Kern | 41 | 89,359 |
Source: EIA Forms EIA-860 and EIA-923, 2025.