Skip to main content
RateWatt

Solar power plant, California

Edwards Sanborn S1 solar power plant, California

Edwards Sanborn S1 is a 84.6 MW power plant, 44.6 MW of it solar, in Kern County, California, operated by Terra-Gen Operating Co-Hybrid, and it generated 100,535 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 74th percentile of U.S. solar plants. By 2025 generation it ranks 3,385th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

84.6 MWNameplate capacity
26%Capacity factor, 2025, solar units, 74th percentile, on 44.6 MW net summer
3,385thU.S. rank by generation, 2025
3 yearsAverage generator age, by MW

How hard does the Edwards Sanborn S1 plant run compared with other solar plants?

The Edwards Sanborn S1 plant's solar units had a capacity factor of 26% in 2025 on 44.6 MW of net summer capacity, the 74th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 97 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Edwards Sanborn S126%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Edwards Sanborn S1 plant generating more or less than last year?

Generation at Edwards Sanborn S1 rose 8.8% from 2024 to 2025, from 92,378 MWh to 100,535 MWh. Through August 2026 it is running 8.9% behind the same months of 2025.

Net generation by period
PeriodMWh
202492,378
2025100,535
2026 through August67,050
2025, same months73,610
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202610,655
July 202610,294
June 202612,269
May 20269,678
April 20266,769
March 20267,422
February 20265,190
January 20264,773
December 20254,450
November 20254,795
October 20258,343
September 20259,337
August 202511,166
July 202512,515
June 202511,653
May 202511,806
April 202510,042
March 20255,833
February 20255,272
January 20255,323
December 20244,021
November 20245,254
October 20247,379
September 20248,765
August 202410,481
July 202411,125
June 202410,914
May 202410,346
April 20248,055
March 20246,353
February 20245,333
January 20244,352

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Edwards Sanborn S1 plant?

Edwards Sanborn S1 made 0.0% of the 204,542,898 MWh reported by California plants in 2025, from 0.1% of the state's 107,433 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 316th largest of 1,877 plants in California, the 2,909th largest of 14,327 in the U.S. and the 950th largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 353rd largest of 1,608 generating plants in the state.

Edwards Sanborn S1 within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)85107,4330.1%
Generation (MWh)100,535204,542,8980.0%
Solar capacity (MW)4524,6630.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Edwards Sanborn S1 plant, and when do they retire?

2 operable generators total 84.6 MW, with an average age of 3 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s285100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
BESSOperatingBatteries402022n/a
PVOperatingSolar Photovoltaic452022n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Edwards Sanborn S1 plant?

ES 1A Group 2 Opco, LLC is the only joint owner reported for Edwards Sanborn S1, with 100.0%. Terra-Gen Operating Co-Hybrid operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Edwards Sanborn S1 plant use?

Edwards Sanborn S1 has capacity on 2 fuels: 53% solar and 47% battery and pumped storage. In 2025, solar made 103% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar4552.7%103,431
Battery and pumped storage4047.3%-2,896

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Edwards Sanborn S1 plant?

Edwards Sanborn S1 is in Mojave, Kern County, California, at 35.0277° N, 118.1328° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Edwards Sanborn S1's 44.6 MW is 0% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
Beacon Solar Plant Site 2Kern47112,294
RE Camelot LLCKern45121,010
RE Gaskell West 2 LLCKern45111,461
Edwards Sanborn S1Kern45103,431
Camino Solar HybridKern44104,804
Arrowleaf Solar and StorageImperial42730
Edwards Sanborn S4Kern4189,359

Source: EIA Forms EIA-860 and EIA-923, 2025.