RE Gaskell West 2 LLC is a 65 MW power plant, 45 MW of it solar, in Kern County, California, operated by RE Gaskell West LLC, and it generated 111,461 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in California, and its capacity factor sits at the 84th percentile of U.S. solar plants. By 2025 generation it ranks 3,282nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

65 MWNameplate capacity
28%Capacity factor, 2025, solar units, 84th percentile, on 45 MW net summer
0.1%Of CA generation, 2025
2 yearsAverage generator age, by MW

How hard does the RE Gaskell West 2 LLC plant run compared with other solar plants?

The RE Gaskell West 2 LLC plant's solar units had a capacity factor of 28% in 2025 on 45 MW of net summer capacity, the 84th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 103 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
RE Gaskell West 2 LLC28%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the RE Gaskell West 2 LLC plant generating more or less than last year?

Generation at RE Gaskell West 2 LLC rose 17.0% from 2024 to 2025, from 95,256 MWh to 111,461 MWh. Through August 2026 it is running 13.4% ahead of the same months of 2025.

Net generation by period
PeriodMWh
202495,256
2025111,461
2026 through August97,360
2025, same months85,884
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202613,960
July 202614,669
June 202615,750
May 202614,916
April 202611,547
March 202610,988
February 20268,142
January 20267,388
December 20256,626
November 20252,334
October 20254,740
September 202511,877
August 202514,231
July 202515,701
June 202515,439
May 20256,496
April 20258,871
March 20258,432
February 20258,359
January 20258,355
December 20249,189
November 20247,497
October 202410,211
September 20247,134
August 20246,745
July 202413,295
June 202413,416
May 20242,947
April 20245,607
March 20246,704
February 20246,457
January 20246,054

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the RE Gaskell West 2 LLC plant?

RE Gaskell West 2 LLC made 0.1% of the 204,542,898 MWh reported by California plants in 2025, from 0.1% of the state's 107,433 MW of capacity. By capacity it is the 361st largest of 1,877 plants in California, the 3,432nd largest of 14,327 in the U.S. and the 945th largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 343rd largest of 1,608 generating plants in the state.

RE Gaskell West 2 LLC within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)65107,4330.1%
Generation (MWh)111,461204,542,8980.1%
Solar capacity (MW)4524,6630.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the RE Gaskell West 2 LLC plant, and when do they retire?

2 operable generators total 65 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s265100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
BA2OperatingBatteries202023n/a
PV2OperatingSolar Photovoltaic452023n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the RE Gaskell West 2 LLC plant?

EIA lists no joint owners for RE Gaskell West 2 LLC. RE Gaskell West LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the RE Gaskell West 2 LLC plant use?

RE Gaskell West 2 LLC has capacity on 2 fuels: 69% solar and 31% battery and pumped storage. In 2025, solar made 100% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar4569.2%111,461
Battery and pumped storage2030.8%0

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the RE Gaskell West 2 LLC plant?

RE Gaskell West 2 LLC is in Rosamond, Kern County, California, at 34.8349° N, 118.5512° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and RE Gaskell West 2 LLC's 45 MW is 0% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
Resurgence Solar IISan Bernardino48140,345
Beacon Solar Plant Site 2Kern47112,294
RE Camelot LLCKern45121,010
RE Gaskell West 2 LLCKern45111,461
Edwards Sanborn S1Kern45103,431
Camino Solar HybridKern44104,804
Arrowleaf Solar and StorageImperial42730