Solar power plant, California
RE Gaskell West 2 LLC solar power plant, California
RE Gaskell West 2 LLC is a 65 MW power plant, 45 MW of it solar, in Kern County, California, operated by RE Gaskell West LLC, and it generated 111,461 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in California, and its capacity factor sits at the 84th percentile of U.S. solar plants. By 2025 generation it ranks 3,282nd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the RE Gaskell West 2 LLC plant run compared with other solar plants?
The RE Gaskell West 2 LLC plant's solar units had a capacity factor of 28% in 2025 on 45 MW of net summer capacity, the 84th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 103 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| RE Gaskell West 2 LLC | 28% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.
Is the RE Gaskell West 2 LLC plant generating more or less than last year?
Generation at RE Gaskell West 2 LLC rose 17.0% from 2024 to 2025, from 95,256 MWh to 111,461 MWh. Through August 2026 it is running 13.4% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 95,256 |
| 2025 | 111,461 |
| 2026 through August | 97,360 |
| 2025, same months | 85,884 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 13,960 |
| July 2026 | 14,669 |
| June 2026 | 15,750 |
| May 2026 | 14,916 |
| April 2026 | 11,547 |
| March 2026 | 10,988 |
| February 2026 | 8,142 |
| January 2026 | 7,388 |
| December 2025 | 6,626 |
| November 2025 | 2,334 |
| October 2025 | 4,740 |
| September 2025 | 11,877 |
| August 2025 | 14,231 |
| July 2025 | 15,701 |
| June 2025 | 15,439 |
| May 2025 | 6,496 |
| April 2025 | 8,871 |
| March 2025 | 8,432 |
| February 2025 | 8,359 |
| January 2025 | 8,355 |
| December 2024 | 9,189 |
| November 2024 | 7,497 |
| October 2024 | 10,211 |
| September 2024 | 7,134 |
| August 2024 | 6,745 |
| July 2024 | 13,295 |
| June 2024 | 13,416 |
| May 2024 | 2,947 |
| April 2024 | 5,607 |
| March 2024 | 6,704 |
| February 2024 | 6,457 |
| January 2024 | 6,054 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the RE Gaskell West 2 LLC plant, and when do they retire?
2 operable generators total 65 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 2 | 65 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| BA2 | Operating | Batteries | 20 | 2023 | n/a |
| PV2 | Operating | Solar Photovoltaic | 45 | 2023 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the RE Gaskell West 2 LLC plant?
EIA lists no joint owners for RE Gaskell West 2 LLC. RE Gaskell West LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What fuels does the RE Gaskell West 2 LLC plant use?
RE Gaskell West 2 LLC has capacity on 2 fuels: 69% solar and 31% battery and pumped storage. In 2025, solar made 100% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Solar | 45 | 69.2% | 111,461 |
| Battery and pumped storage | 20 | 30.8% | 0 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the RE Gaskell West 2 LLC plant?
RE Gaskell West 2 LLC is in Rosamond, Kern County, California, at 34.8349° N, 118.5512° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and RE Gaskell West 2 LLC's 45 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Resurgence Solar II | San Bernardino | 48 | 140,345 |
| Beacon Solar Plant Site 2 | Kern | 47 | 112,294 |
| RE Camelot LLC | Kern | 45 | 121,010 |
| RE Gaskell West 2 LLC | Kern | 45 | 111,461 |
| Edwards Sanborn S1 | Kern | 45 | 103,431 |
| Camino Solar Hybrid | Kern | 44 | 104,804 |
| Arrowleaf Solar and Storage | Imperial | 42 | 730 |
Source: EIA Forms EIA-860 and EIA-923, 2025.