Solar power plant, California
Resurgence Solar II power plant, California
Resurgence Solar II is a 88 MW power plant, 48 MW of it solar, in San Bernardino County, California, operated by Resurgence Solar II, and it generated 134,683 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in California, and its capacity factor sits at the 98th percentile of U.S. solar plants. By 2025 generation it ranks 3,060th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Resurgence Solar II plant run compared with other solar plants?
The Resurgence Solar II plant's solar units had a capacity factor of 33% in 2025 on 48 MW of net summer capacity, the 98th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 122 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Resurgence Solar II | 33% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.
Is the Resurgence Solar II plant generating more or less than last year?
Generation at Resurgence Solar II rose 5.1% from 2024 to 2025, from 128,162 MWh to 134,683 MWh. Through August 2026 it is running 5.6% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 128,162 |
| 2025 | 134,683 |
| 2026 through August | 93,420 |
| 2025, same months | 98,980 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 13,134 |
| July 2026 | 14,508 |
| June 2026 | 13,994 |
| May 2026 | 13,753 |
| April 2026 | 11,971 |
| March 2026 | 11,286 |
| February 2026 | 7,829 |
| January 2026 | 6,945 |
| December 2025 | 6,545 |
| November 2025 | 6,618 |
| October 2025 | 10,673 |
| September 2025 | 11,867 |
| August 2025 | 13,978 |
| July 2025 | 15,995 |
| June 2025 | 15,740 |
| May 2025 | 14,390 |
| April 2025 | 13,551 |
| March 2025 | 9,680 |
| February 2025 | 8,042 |
| January 2025 | 7,604 |
| December 2024 | 6,460 |
| November 2024 | 7,675 |
| October 2024 | 9,666 |
| September 2024 | 12,496 |
| August 2024 | 14,164 |
| July 2024 | 13,755 |
| June 2024 | 15,411 |
| May 2024 | 15,405 |
| April 2024 | 13,333 |
| March 2024 | 9,426 |
| February 2024 | 7,233 |
| January 2024 | 3,138 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Resurgence Solar II plant, and when do they retire?
2 operable generators total 88 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 2 | 88 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| GEN1 | Operating | Solar Photovoltaic | 48 | 2023 | n/a |
| GEN2 | Operating | Batteries | 40 | 2023 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Resurgence Solar II plant?
EIA lists no joint owners for Resurgence Solar II. Resurgence Solar II operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What fuels does the Resurgence Solar II plant use?
Resurgence Solar II has capacity on 2 fuels: 55% solar and 45% battery and pumped storage. In 2025, solar made 104% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Solar | 48 | 54.5% | 140,345 |
| Battery and pumped storage | 40 | 45.5% | -5,662 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the Resurgence Solar II plant?
Resurgence Solar II is in Boron, San Bernardino County, California, at 35.0066° N, 117.5448° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and Resurgence Solar II's 48 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| SloughHouse Solar, LLC | Sacramento | 50 | 49,806 |
| Ocotillo Wells | San Diego | 50 | 108,077 |
| Baldy Mesa 2_Silver Peak Hybrid | San Bernardino | 50 | 126,997 |
| Resurgence Solar II | San Bernardino | 48 | 140,345 |
| Beacon Solar Plant Site 2 | Kern | 47 | 112,294 |
| RE Camelot LLC | Kern | 45 | 121,010 |
| RE Gaskell West 2 LLC | Kern | 45 | 111,461 |
Source: EIA Forms EIA-860 and EIA-923, 2025.