Solar power plant, California
Baldy Mesa 2_Silver Peak Hybrid solar power plant, California
Baldy Mesa 2_Silver Peak Hybrid is a 75 MW power plant, 50 MW of it solar, in San Bernardino County, California, operated by AES Clean Energy, and it generated 118,745 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in California, and its capacity factor sits at the 87th percentile of U.S. solar plants. By 2025 generation it ranks 3,212th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Baldy Mesa 2_Silver Peak Hybrid plant run compared with other solar plants?
The Baldy Mesa 2_Silver Peak Hybrid plant's solar units had a capacity factor of 29% in 2025 on 50 MW of net summer capacity, the 87th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 106 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Baldy Mesa 2_Silver Peak Hybrid | 29% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.
Is the Baldy Mesa 2_Silver Peak Hybrid plant generating more or less than last year?
Baldy Mesa 2_Silver Peak Hybrid generated 118,745 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 8.2% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 0 |
| 2025 | 118,745 |
| 2026 through August | 79,907 |
| 2025, same months | 87,025 |
Monthly generation, Dec 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 12,600 |
| July 2026 | 12,664 |
| June 2026 | 14,183 |
| May 2026 | 12,153 |
| April 2026 | 11,071 |
| March 2026 | 5,514 |
| February 2026 | 6,256 |
| January 2026 | 5,466 |
| December 2025 | 5,154 |
| November 2025 | 5,843 |
| October 2025 | 9,579 |
| September 2025 | 11,144 |
| August 2025 | 13,931 |
| July 2025 | 16,794 |
| June 2025 | 16,078 |
| May 2025 | 15,534 |
| April 2025 | 11,960 |
| March 2025 | 6,999 |
| February 2025 | 5,556 |
| January 2025 | 173 |
| December 2024 | 0 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Baldy Mesa 2_Silver Peak Hybrid plant, and when do they retire?
2 operable generators total 75 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 2 | 75 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| SPKBS | Operating | Batteries | 25 | 2024 | n/a |
| SPKPV | Operating | Solar Photovoltaic | 50 | 2024 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Baldy Mesa 2_Silver Peak Hybrid plant?
EIA lists no joint owners for Baldy Mesa 2_Silver Peak Hybrid. AES Clean Energy operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What fuels does the Baldy Mesa 2_Silver Peak Hybrid plant use?
Baldy Mesa 2_Silver Peak Hybrid has capacity on 2 fuels: 67% solar and 33% battery and pumped storage. In 2025, solar made 107% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Solar | 50 | 66.7% | 126,997 |
| Battery and pumped storage | 25 | 33.3% | -8,252 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the Baldy Mesa 2_Silver Peak Hybrid plant?
Baldy Mesa 2_Silver Peak Hybrid is in Adelanto, San Bernardino County, California, at 34.6091° N, 117.4537° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and Baldy Mesa 2_Silver Peak Hybrid's 50 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Little Bear 5 | Fresno | 50 | 109,837 |
| SloughHouse Solar, LLC | Sacramento | 50 | 49,806 |
| Ocotillo Wells | San Diego | 50 | 108,077 |
| Baldy Mesa 2_Silver Peak Hybrid | San Bernardino | 50 | 126,997 |
| Resurgence Solar II | San Bernardino | 48 | 140,345 |
| Beacon Solar Plant Site 2 | Kern | 47 | 112,294 |
| RE Camelot LLC | Kern | 45 | 121,010 |
Source: EIA Forms EIA-860 and EIA-923, 2025.