Skip to main content
RateWatt

Solar power plant, California

Baldy Mesa 2_Silver Peak Hybrid solar power plant, California

Baldy Mesa 2_Silver Peak Hybrid is a 75 MW power plant, 50 MW of it solar, in San Bernardino County, California, operated by AES Clean Energy, and it generated 118,745 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in California, and its capacity factor sits at the 87th percentile of U.S. solar plants. By 2025 generation it ranks 3,212th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

75 MWNameplate capacity
29%Capacity factor, 2025, solar units, 87th percentile, on 50 MW net summer
0.1%Of CA generation, 2025
1 yearAverage generator age, by MW

How hard does the Baldy Mesa 2_Silver Peak Hybrid plant run compared with other solar plants?

The Baldy Mesa 2_Silver Peak Hybrid plant's solar units had a capacity factor of 29% in 2025 on 50 MW of net summer capacity, the 87th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 106 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Baldy Mesa 2_Silver Peak Hybrid29%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Baldy Mesa 2_Silver Peak Hybrid plant generating more or less than last year?

Baldy Mesa 2_Silver Peak Hybrid generated 118,745 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 8.2% behind the same months of 2025.

Net generation by period
PeriodMWh
20240
2025118,745
2026 through August79,907
2025, same months87,025
Monthly generation, Dec 2024 to Aug 2026
MonthMWh
August 202612,600
July 202612,664
June 202614,183
May 202612,153
April 202611,071
March 20265,514
February 20266,256
January 20265,466
December 20255,154
November 20255,843
October 20259,579
September 202511,144
August 202513,931
July 202516,794
June 202516,078
May 202515,534
April 202511,960
March 20256,999
February 20255,556
January 2025173
December 20240

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Baldy Mesa 2_Silver Peak Hybrid plant?

Baldy Mesa 2_Silver Peak Hybrid made 0.1% of the 204,542,898 MWh reported by California plants in 2025, from 0.1% of the state's 107,433 MW of capacity. By capacity it is the 335th largest of 1,877 plants in California, the 3,097th largest of 14,327 in the U.S. and the 911th largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 332nd largest of 1,608 generating plants in the state.

Baldy Mesa 2_Silver Peak Hybrid within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)75107,4330.1%
Generation (MWh)118,745204,542,8980.1%
Solar capacity (MW)5024,6630.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Baldy Mesa 2_Silver Peak Hybrid plant, and when do they retire?

2 operable generators total 75 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s275100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
SPKBSOperatingBatteries252024n/a
SPKPVOperatingSolar Photovoltaic502024n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Baldy Mesa 2_Silver Peak Hybrid plant?

EIA lists no joint owners for Baldy Mesa 2_Silver Peak Hybrid. AES Clean Energy operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Baldy Mesa 2_Silver Peak Hybrid plant use?

Baldy Mesa 2_Silver Peak Hybrid has capacity on 2 fuels: 67% solar and 33% battery and pumped storage. In 2025, solar made 107% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar5066.7%126,997
Battery and pumped storage2533.3%-8,252

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Baldy Mesa 2_Silver Peak Hybrid plant?

Baldy Mesa 2_Silver Peak Hybrid is in Adelanto, San Bernardino County, California, at 34.6091° N, 117.4537° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Baldy Mesa 2_Silver Peak Hybrid's 50 MW is 0% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
Little Bear 5Fresno50109,837
SloughHouse Solar, LLCSacramento5049,806
Ocotillo WellsSan Diego50108,077
Baldy Mesa 2_Silver Peak HybridSan Bernardino50126,997
Resurgence Solar IISan Bernardino48140,345
Beacon Solar Plant Site 2Kern47112,294
RE Camelot LLCKern45121,010

Source: EIA Forms EIA-860 and EIA-923, 2025.