Solar power plant, California
Little Bear 5 solar power plant, California
Little Bear 5 is a 50 MW solar power plant in Fresno County, California, operated by Little Bear Solar 5, LLC (Longroad), and it generated 109,837 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in California, and its capacity factor sits at the 65th percentile of U.S. solar plants. By 2025 generation it ranks 3,298th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Little Bear 5 plant run compared with other solar plants?
The Little Bear 5 plant had a capacity factor of 25% in 2025 on 50 MW of net summer capacity, the 65th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 92 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Little Bear 5 | 25% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Little Bear 5 plant generating more or less than last year?
Generation at Little Bear 5 fell 5.6% from 2024 to 2025, from 116,331 MWh to 109,837 MWh. Through August 2026 it is running 4.6% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 116,331 |
| 2025 | 109,837 |
| 2026 through August | 88,640 |
| 2025, same months | 92,876 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 13,798 |
| July 2026 | 15,429 |
| June 2026 | 15,575 |
| May 2026 | 11,258 |
| April 2026 | 9,907 |
| March 2026 | 11,264 |
| February 2026 | 6,621 |
| January 2026 | 4,788 |
| December 2025 | 2,206 |
| November 2025 | 4,460 |
| October 2025 | 3,368 |
| September 2025 | 6,927 |
| August 2025 | 14,382 |
| July 2025 | 15,875 |
| June 2025 | 15,871 |
| May 2025 | 14,684 |
| April 2025 | 8,682 |
| March 2025 | 9,214 |
| February 2025 | 6,591 |
| January 2025 | 7,577 |
| December 2024 | 4,579 |
| November 2024 | 6,964 |
| October 2024 | 10,312 |
| September 2024 | 12,339 |
| August 2024 | 15,088 |
| July 2024 | 15,761 |
| June 2024 | 7,019 |
| May 2024 | 16,794 |
| April 2024 | 8,449 |
| March 2024 | 7,454 |
| February 2024 | 6,880 |
| January 2024 | 4,692 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Little Bear 5 plant, and when do they retire?
1 operable generator totals 50 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 50 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| GEN01 | Operating | Solar Photovoltaic | 50 | 2020 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Little Bear 5 plant?
EIA lists no joint owners for Little Bear 5. Little Bear Solar 5, LLC (Longroad) operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Little Bear 5 plant?
Little Bear 5 is in Mendota, Fresno County, California, at 36.7160° N, 120.4150° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and Little Bear 5's 50 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Antelope DSR 1 | Los Angeles | 50 | 131,226 |
| Midway Solar Farm 1 | Imperial | 50 | 108,244 |
| Little Bear 4 | Fresno | 50 | 37,480 |
| Little Bear 5 | Fresno | 50 | 109,837 |
| SloughHouse Solar, LLC | Sacramento | 50 | 49,806 |
| Ocotillo Wells | San Diego | 50 | 108,077 |
| Baldy Mesa 2_Silver Peak Hybrid | San Bernardino | 50 | 126,997 |
Source: EIA Forms EIA-860 and EIA-923, 2025.