Solar power plant, California
Antelope DSR 1 solar power plant, California
Antelope DSR 1 is a 50 MW solar power plant in Los Angeles County, California, operated by AES Distributed Energy, and it generated 131,226 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in California, and its capacity factor sits at the 95th percentile of U.S. solar plants. By 2025 generation it ranks 3,094th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Antelope DSR 1 plant run compared with other solar plants?
The Antelope DSR 1 plant had a capacity factor of 31% in 2025 on 48 MW of net summer capacity, the 95th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 114 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Antelope DSR 1 | 31% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Antelope DSR 1 plant generating more or less than last year?
Generation at Antelope DSR 1 rose 13.5% from 2024 to 2025, from 115,606 MWh to 131,226 MWh. Through August 2026 it is running 16.7% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 115,606 |
| 2025 | 131,226 |
| 2026 through August | 84,367 |
| 2025, same months | 101,252 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 10,609 |
| July 2026 | 12,708 |
| June 2026 | 13,120 |
| May 2026 | 13,638 |
| April 2026 | 12,028 |
| March 2026 | 10,178 |
| February 2026 | 6,572 |
| January 2026 | 5,514 |
| December 2025 | 5,276 |
| November 2025 | 5,374 |
| October 2025 | 9,006 |
| September 2025 | 10,318 |
| August 2025 | 12,639 |
| July 2025 | 14,854 |
| June 2025 | 14,021 |
| May 2025 | 13,855 |
| April 2025 | 12,858 |
| March 2025 | 9,973 |
| February 2025 | 7,388 |
| January 2025 | 15,664 |
| December 2024 | 5,435 |
| November 2024 | 6,181 |
| October 2024 | 8,398 |
| September 2024 | 10,116 |
| August 2024 | 12,334 |
| July 2024 | 12,877 |
| June 2024 | 14,112 |
| May 2024 | 13,964 |
| April 2024 | 11,661 |
| March 2024 | 9,039 |
| February 2024 | 6,186 |
| January 2024 | 5,303 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Antelope DSR 1 plant, and when do they retire?
1 operable generator totals 50 MW, with an average age of 9 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 50 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| DSR1 | Operating | Solar Photovoltaic | 50 | 2016 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Antelope DSR 1 plant?
EIA lists no joint owners for Antelope DSR 1. AES Distributed Energy operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Antelope DSR 1 plant?
Antelope DSR 1 is in Lancaster, Los Angeles County, California, at 34.6556° N, 118.2807° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and Antelope DSR 1's 50 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Alpaugh 50 | Tulare | 50 | 57,324 |
| Hecate Energy Beacon Solar 4 | Kern | 50 | 115,929 |
| Borden Solar Farm | Madera | 50 | 113,447 |
| Antelope DSR 1 | Los Angeles | 50 | 131,226 |
| Midway Solar Farm 1 | Imperial | 50 | 108,244 |
| Little Bear 4 | Fresno | 50 | 37,480 |
| Little Bear 5 | Fresno | 50 | 109,837 |
Source: EIA Forms EIA-860 and EIA-923, 2025.