Solar power plant, California

Antelope DSR 1 solar power plant, California

Antelope DSR 1 is a 50 MW solar power plant in Los Angeles County, California, operated by AES Distributed Energy, and it generated 131,226 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in California, and its capacity factor sits at the 95th percentile of U.S. solar plants. By 2025 generation it ranks 3,094th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

50 MWNameplate capacity
31%Capacity factor, 2025, 95th percentile, on 48 MW net summer
0.1%Of CA generation, 2025
9 yearsAverage generator age, by MW

How hard does the Antelope DSR 1 plant run compared with other solar plants?

The Antelope DSR 1 plant had a capacity factor of 31% in 2025 on 48 MW of net summer capacity, the 95th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 114 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Antelope DSR 131%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Antelope DSR 1 plant generating more or less than last year?

Generation at Antelope DSR 1 rose 13.5% from 2024 to 2025, from 115,606 MWh to 131,226 MWh. Through August 2026 it is running 16.7% behind the same months of 2025.

Net generation by period
PeriodMWh
2024115,606
2025131,226
2026 through August84,367
2025, same months101,252
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202610,609
July 202612,708
June 202613,120
May 202613,638
April 202612,028
March 202610,178
February 20266,572
January 20265,514
December 20255,276
November 20255,374
October 20259,006
September 202510,318
August 202512,639
July 202514,854
June 202514,021
May 202513,855
April 202512,858
March 20259,973
February 20257,388
January 202515,664
December 20245,435
November 20246,181
October 20248,398
September 202410,116
August 202412,334
July 202412,877
June 202414,112
May 202413,964
April 202411,661
March 20249,039
February 20246,186
January 20245,303

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Antelope DSR 1 plant?

Antelope DSR 1 made 0.1% of the 204,542,898 MWh reported by California plants in 2025, from 0.0% of the state's 107,433 MW of capacity. Its share of output is 1.4 times its share of capacity. By capacity it is the 416th largest of 1,877 plants in California, the 3,754th largest of 14,327 in the U.S. and the 870th largest of 7,223 solar plants. By 2025 generation it is the 314th largest of 1,608 generating plants in the state.

Antelope DSR 1 within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)50107,4330.0%
Generation (MWh)131,226204,542,8980.1%
Solar capacity (MW)5024,6630.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Antelope DSR 1 plant, and when do they retire?

1 operable generator totals 50 MW, with an average age of 9 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s150100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
DSR1OperatingSolar Photovoltaic502016n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Antelope DSR 1 plant?

EIA lists no joint owners for Antelope DSR 1. AES Distributed Energy operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Antelope DSR 1 plant?

Antelope DSR 1 is in Lancaster, Los Angeles County, California, at 34.6556° N, 118.2807° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Antelope DSR 1's 50 MW is 0% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
Alpaugh 50Tulare5057,324
Hecate Energy Beacon Solar 4Kern50115,929
Borden Solar FarmMadera50113,447
Antelope DSR 1Los Angeles50131,226
Midway Solar Farm 1Imperial50108,244
Little Bear 4Fresno5037,480
Little Bear 5Fresno50109,837

Source: EIA Forms EIA-860 and EIA-923, 2025.