Solar power plant, California

Hecate Energy Beacon Solar 4 power plant, California

Hecate Energy Beacon Solar 4 is a 50 MW solar power plant in Kern County, California, operated by AES Distributed Energy, and it generated 115,929 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in California, and its capacity factor sits at the 83rd percentile of U.S. solar plants. By 2025 generation it ranks 3,244th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

50 MWNameplate capacity
28%Capacity factor, 2025, 83rd percentile, on 47 MW net summer
0.1%Of CA generation, 2025
9 yearsAverage generator age, by MW

How hard does the Hecate Energy Beacon Solar 4 plant run compared with other solar plants?

The Hecate Energy Beacon Solar 4 plant had a capacity factor of 28% in 2025 on 47 MW of net summer capacity, the 83rd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 103 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Hecate Energy Beacon Solar 428%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Hecate Energy Beacon Solar 4 plant generating more or less than last year?

Generation at Hecate Energy Beacon Solar 4 rose 0.4% from 2024 to 2025, from 115,482 MWh to 115,929 MWh. Through August 2026 it is running 4.1% behind the same months of 2025.

Net generation by period
PeriodMWh
2024115,482
2025115,929
2026 through August82,996
2025, same months86,532
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202611,317
July 202612,217
June 202613,362
May 202611,739
April 202612,028
March 202610,014
February 20266,582
January 20265,737
December 20255,165
November 20255,279
October 20258,967
September 20259,986
August 202511,955
July 202513,902
June 202513,306
May 202513,469
April 202512,433
March 20258,518
February 20256,557
January 20256,392
December 20245,293
November 20246,518
October 20248,826
September 202410,590
August 202412,239
July 202412,364
June 202413,170
May 202413,686
April 202411,981
March 20249,246
February 20246,228
January 20245,341

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Hecate Energy Beacon Solar 4 plant?

Hecate Energy Beacon Solar 4 made 0.1% of the 204,542,898 MWh reported by California plants in 2025, from 0.0% of the state's 107,433 MW of capacity. Its share of output is 1.2 times its share of capacity. By capacity it is the 416th largest of 1,877 plants in California, the 3,754th largest of 14,327 in the U.S. and the 865th largest of 7,223 solar plants. By 2025 generation it is the 335th largest of 1,608 generating plants in the state.

Hecate Energy Beacon Solar 4 within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)50107,4330.0%
Generation (MWh)115,929204,542,8980.1%
Solar capacity (MW)5024,6630.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Hecate Energy Beacon Solar 4 plant, and when do they retire?

1 operable generator totals 50 MW, with an average age of 9 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s150100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
BEAC4OperatingSolar Photovoltaic502016n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Hecate Energy Beacon Solar 4 plant?

EIA lists no joint owners for Hecate Energy Beacon Solar 4. AES Distributed Energy operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Hecate Energy Beacon Solar 4 plant?

Hecate Energy Beacon Solar 4 is in Cantil, Kern County, California, at 35.2536° N, 118.0269° W. It sits in the Los Angeles Department of Water and Power balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Hecate Energy Beacon Solar 4's 50 MW is 0% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
Golden Fields Solar I, LLCKern54137,670
Solar Star California, XLI, LLCKern54147,197
Alpaugh 50Tulare5057,324
Hecate Energy Beacon Solar 4Kern50115,929
Borden Solar FarmMadera50113,447
Antelope DSR 1Los Angeles50131,226
Midway Solar Farm 1Imperial50108,244

Source: EIA Forms EIA-860 and EIA-923, 2025.