Solar power plant, California

Borden Solar Farm, California

Borden Solar Farm is a 50 MW solar power plant in Madera County, California, operated by 41MB 8me, LLC, and it generated 113,447 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in California, and its capacity factor sits at the 71st percentile of U.S. solar plants. By 2025 generation it ranks 3,271st of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

50 MWNameplate capacity
26%Capacity factor, 2025, 71st percentile, on 50 MW net summer
0.1%Of CA generation, 2025
5 yearsAverage generator age, by MW

How hard does the Borden Solar Farm plant run compared with other solar plants?

The Borden Solar Farm plant had a capacity factor of 26% in 2025 on 50 MW of net summer capacity, the 71st percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 95 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Borden Solar Farm26%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Borden Solar Farm plant generating more or less than last year?

Generation at Borden Solar Farm fell 0.4% from 2024 to 2025, from 113,880 MWh to 113,447 MWh. Through August 2026 it is running 41.6% behind the same months of 2025.

Net generation by period
PeriodMWh
2024113,880
2025113,447
2026 through August52,718
2025, same months90,245
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 20268,901
July 20267,604
June 20266,804
May 20268,461
April 20266,232
March 20266,695
February 20264,470
January 20263,551
December 20251,804
November 20253,228
October 20256,919
September 202511,251
August 202514,534
July 202515,946
June 202515,731
May 202514,979
April 202512,212
March 20252,732
February 20256,881
January 20257,230
December 20244,065
November 20245,917
October 20249,549
September 202411,995
August 202413,308
July 202412,733
June 202410,395
May 20249,543
April 202413,342
March 202411,005
February 20247,148
January 20244,880

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Borden Solar Farm plant?

Borden Solar Farm made 0.1% of the 204,542,898 MWh reported by California plants in 2025, from 0.0% of the state's 107,433 MW of capacity. By capacity it is the 416th largest of 1,877 plants in California, the 3,754th largest of 14,327 in the U.S. and the 866th largest of 7,223 solar plants. By 2025 generation it is the 338th largest of 1,608 generating plants in the state.

Borden Solar Farm within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)50107,4330.0%
Generation (MWh)113,447204,542,8980.1%
Solar capacity (MW)5024,6630.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Borden Solar Farm plant, and when do they retire?

1 operable generator totals 50 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s150100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
BRDNOperatingSolar Photovoltaic502020n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Borden Solar Farm plant?

EIA lists no joint owners for Borden Solar Farm. 41MB 8me, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Borden Solar Farm plant?

Borden Solar Farm is in Madera, Madera County, California, at 36.9411° N, 119.9600° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Borden Solar Farm's 50 MW is 0% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
Solar Star California, XLI, LLCKern54147,197
Alpaugh 50Tulare5057,324
Hecate Energy Beacon Solar 4Kern50115,929
Borden Solar FarmMadera50113,447
Antelope DSR 1Los Angeles50131,226
Midway Solar Farm 1Imperial50108,244
Little Bear 4Fresno5037,480

Source: EIA Forms EIA-860 and EIA-923, 2025.