Solar power plant, California
Solar Star California, XLI, LLC power plant, California
Solar Star California, XLI, LLC is a 54 MW solar power plant in Kern County, California, operated by MN8 Energy LLC, and it generated 147,197 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in California, and its capacity factor sits at the 95th percentile of U.S. solar plants. By 2025 generation it ranks 2,931st of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Solar Star California, XLI, LLC plant run compared with other solar plants?
The Solar Star California, XLI, LLC plant had a capacity factor of 31% in 2025 on 54 MW of net summer capacity, the 95th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 114 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Solar Star California, XLI, LLC | 31% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Solar Star California, XLI, LLC plant generating more or less than last year?
Generation at Solar Star California, XLI, LLC fell 0.7% from 2024 to 2025, from 148,254 MWh to 147,197 MWh. Through August 2026 it is running 12.0% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 148,254 |
| 2025 | 147,197 |
| 2026 through August | 97,384 |
| 2025, same months | 110,711 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 13,717 |
| July 2026 | 14,852 |
| June 2026 | 15,138 |
| May 2026 | 14,896 |
| April 2026 | 12,843 |
| March 2026 | 11,986 |
| February 2026 | 7,469 |
| January 2026 | 6,483 |
| December 2025 | 6,010 |
| November 2025 | 6,151 |
| October 2025 | 11,651 |
| September 2025 | 12,674 |
| August 2025 | 15,248 |
| July 2025 | 17,600 |
| June 2025 | 16,094 |
| May 2025 | 16,105 |
| April 2025 | 14,779 |
| March 2025 | 12,864 |
| February 2025 | 9,261 |
| January 2025 | 8,760 |
| December 2024 | 6,993 |
| November 2024 | 7,998 |
| October 2024 | 11,500 |
| September 2024 | 13,562 |
| August 2024 | 15,995 |
| July 2024 | 16,102 |
| June 2024 | 16,846 |
| May 2024 | 17,156 |
| April 2024 | 14,899 |
| March 2024 | 11,506 |
| February 2024 | 8,203 |
| January 2024 | 7,494 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Solar Star California, XLI, LLC plant, and when do they retire?
1 operable generator totals 54 MW, with an average age of 9 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 54 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| RS1 | Operating | Solar Photovoltaic | 54 | 2016 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Solar Star California, XLI, LLC plant?
Solar Star California, XLI, LLC is the only joint owner reported for Solar Star California, XLI, LLC, with 100.0%. MN8 Energy LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Solar Star California, XLI, LLC plant?
Solar Star California, XLI, LLC is in Rosamond, Kern County, California, at 34.8390° N, 118.3868° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and Solar Star California, XLI, LLC's 54 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Estrella Solar & Storage | Los Angeles | 56 | 157,488 |
| Luciana | Tulare | 56 | 137,133 |
| Golden Fields Solar I, LLC | Kern | 54 | 137,670 |
| Solar Star California, XLI, LLC | Kern | 54 | 147,197 |
| Alpaugh 50 | Tulare | 50 | 57,324 |
| Hecate Energy Beacon Solar 4 | Kern | 50 | 115,929 |
| Borden Solar Farm | Madera | 50 | 113,447 |
Source: EIA Forms EIA-860 and EIA-923, 2025.