Solar power plant, California
Estrella Solar & Storage power plant, California
Estrella Solar & Storage is a 84 MW power plant, 56 MW of it solar, in Los Angeles County, California, operated by AES Clean Energy, and it generated 153,344 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in California, and its capacity factor sits at the 97th percentile of U.S. solar plants. By 2025 generation it ranks 2,865th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Estrella Solar & Storage plant run compared with other solar plants?
The Estrella Solar & Storage plant's solar units had a capacity factor of 32% in 2025 on 56 MW of net summer capacity, the 97th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 117 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Estrella Solar & Storage | 32% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.
Is the Estrella Solar & Storage plant generating more or less than last year?
Estrella Solar & Storage generated 153,344 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 1.8% ahead of the same months of 2025. 2024 has output for only 10 months, so the two years are not compared.
2 months show net generation below zero, when the plant used more power than it sent out, so the months are listed below rather than charted.
| Period | MWh |
|---|---|
| 2024 | 114,192 |
| 2025 | 153,344 |
| 2026 through August | 114,771 |
| 2025, same months | 112,780 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 16,185 |
| July 2026 | 17,195 |
| June 2026 | 18,762 |
| May 2026 | 17,623 |
| April 2026 | 14,771 |
| March 2026 | 13,600 |
| February 2026 | 8,660 |
| January 2026 | 7,975 |
| December 2025 | 7,292 |
| November 2025 | 7,228 |
| October 2025 | 12,490 |
| September 2025 | 13,554 |
| August 2025 | 16,233 |
| July 2025 | 18,963 |
| June 2025 | 17,993 |
| May 2025 | 16,699 |
| April 2025 | 15,605 |
| March 2025 | 10,569 |
| February 2025 | 7,936 |
| January 2025 | 8,782 |
| December 2024 | 7,484 |
| November 2024 | 8,038 |
| October 2024 | 11,247 |
| September 2024 | 12,541 |
| August 2024 | 15,992 |
| July 2024 | 15,861 |
| June 2024 | -862 |
| May 2024 | -251 |
| April 2024 | 15,164 |
| March 2024 | 11,415 |
| February 2024 | 8,726 |
| January 2024 | 8,837 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Estrella Solar & Storage plant, and when do they retire?
2 operable generators total 84 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 2 | 84 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| ESPV | Operating | Solar Photovoltaic | 56 | 2023 | n/a |
| ESTRB | Operating | Batteries | 28 | 2023 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Estrella Solar & Storage plant?
EIA lists no joint owners for Estrella Solar & Storage. AES Clean Energy operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What fuels does the Estrella Solar & Storage plant use?
Estrella Solar & Storage has capacity on 2 fuels: 67% solar and 33% battery and pumped storage. In 2025, solar made 103% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Solar | 56 | 66.7% | 157,488 |
| Battery and pumped storage | 28 | 33.3% | -4,144 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the Estrella Solar & Storage plant?
Estrella Solar & Storage is in Lancaster, Los Angeles County, California, at 34.8078° N, 118.3165° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and Estrella Solar & Storage's 56 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| SF Azalea, LLC | Kern | 60 | 44 |
| Hecate Energy Beacon Solar 1 | Kern | 56 | 128,675 |
| Hecate Energy Beacon Solar 3 | Kern | 56 | 122,062 |
| Estrella Solar & Storage | Los Angeles | 56 | 157,488 |
| Luciana | Tulare | 56 | 137,133 |
| Golden Fields Solar I, LLC | Kern | 54 | 137,670 |
| Solar Star California, XLI, LLC | Kern | 54 | 147,197 |
Source: EIA Forms EIA-860 and EIA-923, 2025.