Hecate Energy Beacon Solar 1 is a 56 MW solar power plant in Kern County, California, operated by AES Distributed Energy, and it generated 128,675 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in California, and its capacity factor sits at the 86th percentile of U.S. solar plants. By 2025 generation it ranks 3,114th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

56 MWNameplate capacity
29%Capacity factor, 2025, 86th percentile, on 51 MW net summer
0.1%Of CA generation, 2025
8 yearsAverage generator age, by MW

How hard does the Hecate Energy Beacon Solar 1 plant run compared with other solar plants?

The Hecate Energy Beacon Solar 1 plant had a capacity factor of 29% in 2025 on 51 MW of net summer capacity, the 86th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 105 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Hecate Energy Beacon Solar 129%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Hecate Energy Beacon Solar 1 plant generating more or less than last year?

Generation at Hecate Energy Beacon Solar 1 rose 0.4% from 2024 to 2025, from 128,220 MWh to 128,675 MWh. Through August 2026 it is running 7.1% behind the same months of 2025.

Net generation by period
PeriodMWh
2024128,220
2025128,675
2026 through August90,241
2025, same months97,101
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202612,613
July 202613,557
June 202614,383
May 202612,345
April 202612,939
March 202610,811
February 20267,360
January 20266,233
December 20255,633
November 20255,659
October 20259,599
September 202510,683
August 202513,280
July 202515,632
June 202515,416
May 202514,762
April 202513,833
March 20259,548
February 20257,402
January 20257,228
December 20245,939
November 20247,204
October 20249,748
September 202411,606
August 202413,873
July 202413,770
June 202415,012
May 202415,804
April 202413,842
March 202410,888
February 20243,976
January 20246,558

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Hecate Energy Beacon Solar 1 plant?

Hecate Energy Beacon Solar 1 made 0.1% of the 204,542,898 MWh reported by California plants in 2025, from 0.1% of the state's 107,433 MW of capacity. Its share of output is 1.2 times its share of capacity. By capacity it is the 398th largest of 1,877 plants in California, the 3,617th largest of 14,327 in the U.S. and the 828th largest of 7,223 solar plants. By 2025 generation it is the 320th largest of 1,608 generating plants in the state.

Hecate Energy Beacon Solar 1 within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)56107,4330.1%
Generation (MWh)128,675204,542,8980.1%
Solar capacity (MW)5624,6630.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Hecate Energy Beacon Solar 1 plant, and when do they retire?

1 operable generator totals 56 MW, with an average age of 8 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s156100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
BEAC1OperatingSolar Photovoltaic562017n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Hecate Energy Beacon Solar 1 plant?

EIA lists no joint owners for Hecate Energy Beacon Solar 1. AES Distributed Energy operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Hecate Energy Beacon Solar 1 plant?

Hecate Energy Beacon Solar 1 is in Cantil, Kern County, California, at 35.2694° N, 118.0144° W. It sits in the Los Angeles Department of Water and Power balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Hecate Energy Beacon Solar 1's 56 MW is 0% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
Five Points Solar ParkFresno6080,718
RE Barren Ridge 1Kern60164,367
SF Azalea, LLCKern6044
Hecate Energy Beacon Solar 1Kern56128,675
Hecate Energy Beacon Solar 3Kern56122,062
Estrella Solar & StorageLos Angeles56157,488
LucianaTulare56137,133