Solar power plant, California
RE Barren Ridge 1 solar power plant, California
RE Barren Ridge 1 is a 60 MW solar power plant in Kern County, California, operated by RE Barren Ridge 1, LLC, and it generated 164,367 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in California, and its capacity factor sits at the 95th percentile of U.S. solar plants. By 2025 generation it ranks 2,768th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the RE Barren Ridge 1 plant run compared with other solar plants?
The RE Barren Ridge 1 plant had a capacity factor of 31% in 2025 on 60 MW of net summer capacity, the 95th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 114 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| RE Barren Ridge 1 | 31% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the RE Barren Ridge 1 plant generating more or less than last year?
Generation at RE Barren Ridge 1 fell 6.1% from 2024 to 2025, from 174,985 MWh to 164,367 MWh.
| Period | MWh |
|---|---|
| 2024 | 174,985 |
| 2025 | 164,367 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 7,779 |
| November 2025 | 7,891 |
| October 2025 | 13,212 |
| September 2025 | 14,495 |
| August 2025 | 17,289 |
| July 2025 | 19,920 |
| June 2025 | 17,991 |
| May 2025 | 19,063 |
| April 2025 | 16,446 |
| March 2025 | 9,838 |
| February 2025 | 10,458 |
| January 2025 | 9,985 |
| December 2024 | 8,164 |
| November 2024 | 9,864 |
| October 2024 | 13,233 |
| September 2024 | 15,452 |
| August 2024 | 18,384 |
| July 2024 | 18,917 |
| June 2024 | 19,821 |
| May 2024 | 20,019 |
| April 2024 | 18,406 |
| March 2024 | 14,201 |
| February 2024 | 9,913 |
| January 2024 | 8,611 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the RE Barren Ridge 1 plant, and when do they retire?
1 operable generator totals 60 MW, with an average age of 9 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 60 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| REBR1 | Operating | Solar Photovoltaic | 60 | 2016 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the RE Barren Ridge 1 plant?
EIA lists no joint owners for RE Barren Ridge 1. RE Barren Ridge 1, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the RE Barren Ridge 1 plant?
RE Barren Ridge 1 is in Mojave, Kern County, California, at 35.2047° N, 118.0687° W. It sits in the Los Angeles Department of Water and Power balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and RE Barren Ridge 1's 60 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| North Star Solar | Fresno | 62 | 133,232 |
| Regulus Solar Project | Kern | 60 | 149,746 |
| Five Points Solar Park | Fresno | 60 | 80,718 |
| RE Barren Ridge 1 | Kern | 60 | 164,367 |
| SF Azalea, LLC | Kern | 60 | 44 |
| Hecate Energy Beacon Solar 1 | Kern | 56 | 128,675 |
| Hecate Energy Beacon Solar 3 | Kern | 56 | 122,062 |
Source: EIA Forms EIA-860 and EIA-923, 2025.