Skip to main content
RateWatt

Solar power plant, California

Hecate Energy Beacon Solar 3 power plant, California

Hecate Energy Beacon Solar 3 is a 56 MW solar power plant in Kern County, California, operated by AES Distributed Energy, and it generated 122,062 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in California, and its capacity factor sits at the 79th percentile of U.S. solar plants. By 2025 generation it ranks 3,179th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

56 MWNameplate capacity
27%Capacity factor, 2025, 79th percentile, on 51 MW net summer
0.1%Of CA generation, 2025
9 yearsAverage generator age, by MW

How hard does the Hecate Energy Beacon Solar 3 plant run compared with other solar plants?

The Hecate Energy Beacon Solar 3 plant had a capacity factor of 27% in 2025 on 51 MW of net summer capacity, the 79th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 100 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Hecate Energy Beacon Solar 327%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Hecate Energy Beacon Solar 3 plant generating more or less than last year?

Generation at Hecate Energy Beacon Solar 3 fell 7.7% from 2024 to 2025, from 132,212 MWh to 122,062 MWh. Through August 2026 it is running 8.2% behind the same months of 2025.

Net generation by period
PeriodMWh
2024132,212
2025122,062
2026 through August84,538
2025, same months92,046
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202611,071
July 202612,060
June 202613,549
May 202612,122
April 202612,427
March 202610,296
February 20266,942
January 20266,071
December 20255,379
November 20255,454
October 20258,955
September 202510,228
August 202512,491
July 202514,349
June 202514,142
May 202514,235
April 202513,054
March 20259,361
February 20257,257
January 20257,157
December 20245,913
November 20247,033
October 20249,579
September 202411,499
August 202413,721
July 202414,126
June 202415,290
May 202416,108
April 202414,184
March 202410,707
February 20247,471
January 20246,581

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Hecate Energy Beacon Solar 3 plant?

Hecate Energy Beacon Solar 3 made 0.1% of the 204,542,898 MWh reported by California plants in 2025, from 0.1% of the state's 107,433 MW of capacity. By capacity it is the 398th largest of 1,877 plants in California, the 3,617th largest of 14,327 in the U.S. and the 829th largest of 7,223 solar plants. By 2025 generation it is the 330th largest of 1,608 generating plants in the state.

Hecate Energy Beacon Solar 3 within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)56107,4330.1%
Generation (MWh)122,062204,542,8980.1%
Solar capacity (MW)5624,6630.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Hecate Energy Beacon Solar 3 plant, and when do they retire?

1 operable generator totals 56 MW, with an average age of 9 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s156100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
BEAC3OperatingSolar Photovoltaic562016n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Hecate Energy Beacon Solar 3 plant?

EIA lists no joint owners for Hecate Energy Beacon Solar 3. AES Distributed Energy operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Hecate Energy Beacon Solar 3 plant?

Hecate Energy Beacon Solar 3 is in Cantil, Kern County, California, at 35.2531° N, 118.0147° W. It sits in the Los Angeles Department of Water and Power balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Hecate Energy Beacon Solar 3's 56 MW is 0% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
RE Barren Ridge 1Kern60164,367
SF Azalea, LLCKern6044
Hecate Energy Beacon Solar 1Kern56128,675
Hecate Energy Beacon Solar 3Kern56122,062
Estrella Solar & StorageLos Angeles56157,488
LucianaTulare56137,133
Golden Fields Solar I, LLCKern54137,670

Source: EIA Forms EIA-860 and EIA-923, 2025.