Natural gas power plant, California
Lodi Energy Center, California
Lodi Energy Center is a 289 MW natural gas power plant in San Joaquin County, California, operated by Northern California Power Agny, and it generated 580,109 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in California, and its capacity factor sits at the 53rd percentile of U.S. natural gas plants. By 2025 generation it ranks 1,165th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Lodi Energy Center plant run compared with other natural gas plants?
The Lodi Energy Center plant had a capacity factor of 24% in 2025 on 273 MW of net summer capacity, the 53rd percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 89 days at full output out of 365.
0%Shaded: the middle half of natural gas plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Lodi Energy Center | 24% |
| Natural gas plants, 75th percentile | 56% |
| Natural gas plants, median | 22% |
| Natural gas plants, 25th percentile | 6% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Lodi Energy Center plant generating more or less than last year?
Generation at Lodi Energy Center fell 25.3% from 2024 to 2025, from 776,167 MWh to 580,109 MWh. Through August 2026 it is running 13.8% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 776,167 |
| 2025 | 580,109 |
| 2026 through August | 295,893 |
| 2025, same months | 343,366 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 150,547 |
| July 2026 | 47,035 |
| June 2026 | 10,946 |
| May 2026 | 27,697 |
| April 2026 | 0 |
| March 2026 | 14,637 |
| February 2026 | 22,281 |
| January 2026 | 22,750 |
| December 2025 | 56,024 |
| November 2025 | 115,749 |
| October 2025 | 62,432 |
| September 2025 | 2,538 |
| August 2025 | 73,934 |
| July 2025 | 4,329 |
| June 2025 | 667 |
| May 2025 | 15,230 |
| April 2025 | 0 |
| March 2025 | 32,556 |
| February 2025 | 59,544 |
| January 2025 | 157,106 |
| December 2024 | 116,639 |
| November 2024 | 100,241 |
| October 2024 | 110,571 |
| September 2024 | 34,282 |
| August 2024 | 55,214 |
| July 2024 | 104,830 |
| June 2024 | 8,184 |
| May 2024 | 4,282 |
| April 2024 | 1,604 |
| March 2024 | 11,544 |
| February 2024 | 73,757 |
| January 2024 | 155,019 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Lodi Energy Center plant, and when do they retire?
2 operable generators total 289 MW, with an average age of 13 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 2 | 289 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| CT1 | Operating | Natural Gas Fired Combined Cycle | 185 | 2012 | n/a |
| ST1 | Operating | Natural Gas Fired Combined Cycle | 104 | 2012 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Lodi Energy Center plant?
EIA lists no joint owners for Lodi Energy Center. Northern California Power Agny operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Lodi Energy Center plant?
Lodi Energy Center is in Lodi, San Joaquin County, California, at 38.0881° N, 121.3875° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which natural gas plants in California are similar in size?
California has 304 operable natural gas plants with 40,211 MW of capacity, and Lodi Energy Center's 289 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Walnut Energy Center | Stanislaus | 301 | 1,604,800 |
| Kern River Cogeneration | Kern | 300 | 112,424 |
| Sycamore Cogeneration | Kern | 300 | 197,249 |
| Lodi Energy Center | San Joaquin | 289 | 580,109 |
| Glenarm | Los Angeles | 266 | 129,845 |
| Long Beach Generation | Los Angeles | 252 | 5,878 |
| Crockett Cogen Project | Contra Costa | 247 | 1,275,138 |
Source: EIA Forms EIA-860 and EIA-923, 2025.