Crockett Cogen Project, California

Crockett Cogen Project is a 247 MW natural gas power plant in Contra Costa County, California, operated by Crockett Cogeneration, and it generated 1,275,138 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.6% of the generation reported in California, and its capacity factor sits at the 77th percentile of U.S. natural gas plants. By 2025 generation it ranks 642nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

247 MWNameplate capacity
59%Capacity factor, 2025, 77th percentile, on 247 MW net summer
0.6%Of CA generation, 2025
30 yearsAverage generator age, by MW

How hard does the Crockett Cogen Project plant run compared with other natural gas plants?

The Crockett Cogen Project plant had a capacity factor of 59% in 2025 on 247 MW of net summer capacity, the 77th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 215 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Crockett Cogen Project59%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Crockett Cogen Project plant generating more or less than last year?

Generation at Crockett Cogen Project fell 6.8% from 2024 to 2025, from 1,368,470 MWh to 1,275,138 MWh. Through August 2026 it is running 74.9% behind the same months of 2025.

Net generation by period
PeriodMWh
20241,368,470
20251,275,138
2026 through August212,761
2025, same months848,010
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 20261,656
July 20260
June 20260
May 20260
April 20260
March 20260
February 202673,632
January 2026137,473
December 2025132,305
November 202551,729
October 2025120,340
September 2025122,754
August 2025119,071
July 2025133,758
June 2025132,769
May 202576,748
April 2025137,822
March 202556,892
February 202587,274
January 2025103,676
December 202471,374
November 20244,204
October 2024104,625
September 2024126,480
August 2024139,718
July 2024130,492
June 2024124,376
May 2024134,815
April 2024144,889
March 2024105,024
February 2024151,246
January 2024131,227

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Crockett Cogen Project plant?

Crockett Cogen Project made 0.6% of the 204,542,898 MWh reported by California plants in 2025, from 0.2% of the state's 107,433 MW of capacity. Its share of output is 2.7 times its share of capacity. By capacity it is the 108th largest of 1,877 plants in California, the 1,295th largest of 14,327 in the U.S. and the 665th largest of 1,962 natural gas plants. By 2025 generation it is the 28th largest of 1,608 generating plants in the state.

Crockett Cogen Project within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)247107,4330.2%
Generation (MWh)1,275,138204,542,8980.6%
Natural gas capacity (MW)24740,2110.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Crockett Cogen Project plant, and when do they retire?

1 operable generator totals 247 MW, with an average age of 30 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1990s1247100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GE1OperatingNatural Gas Fired Combined Cycle2471995n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Crockett Cogen Project plant?

2 owners report shares in Crockett Cogen Project; ENI Crockett Ltd holds the largest named share, 99.0% or about 245 MW. Crockett Cogeneration operates the plant.

Reported ownership of operable capacity
OwnerShareMW2025 MWh, by share
ENI Crockett Ltd99.0%2451,262,387
Pacific Crockett Energy Inc1.0%212,751

Source: EIA Form EIA-860, Owner, 2025 final. MW and MWh by share multiply the plant totals by each owner's percentage.

Where is the Crockett Cogen Project plant?

Crockett Cogen Project is in Crockett, Contra Costa County, California, at 38.0569° N, 122.2161° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in California are similar in size?

California has 304 operable natural gas plants with 40,211 MW of capacity, and Crockett Cogen Project's 247 MW is 1% of that.

Natural gas plants in California around this size
PlantCountyMW2025 MWh
Lodi Energy CenterSan Joaquin289580,109
GlenarmLos Angeles266129,845
Long Beach GenerationLos Angeles2525,878
Crockett Cogen ProjectContra Costa2471,275,138
Midway Sunset CogenKern23447,263
Roseville Energy ParkPlacer225461,905
Almond Power PlantStanislaus224133,198