Natural gas power plant, California
Almond Power Plant, California
Almond Power Plant is a 224 MW natural gas power plant in Stanislaus County, California, operated by Turlock Irrigation District, and it generated 133,198 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in California, and its capacity factor sits at the 31st percentile of U.S. natural gas plants. By 2025 generation it ranks 3,082nd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does Almond Power Plant run compared with other natural gas plants?
Almond Power Plant had a capacity factor of 8% in 2025 on 200 MW of net summer capacity, the 31st percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 28 days at full output out of 365.
0%Shaded: the middle half of natural gas plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Almond Power Plant | 8% |
| Natural gas plants, 75th percentile | 56% |
| Natural gas plants, median | 22% |
| Natural gas plants, 25th percentile | 6% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is Almond Power Plant generating more or less than last year?
Generation at Almond Power Plant fell 23.0% from 2024 to 2025, from 172,986 MWh to 133,198 MWh. Through August 2026 it is running 19.8% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 172,986 |
| 2025 | 133,198 |
| 2026 through August | 115,127 |
| 2025, same months | 96,075 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 28,736 |
| July 2026 | 18,721 |
| June 2026 | 10,040 |
| May 2026 | 5,096 |
| April 2026 | 22,127 |
| March 2026 | 16,669 |
| February 2026 | 7,970 |
| January 2026 | 5,768 |
| December 2025 | 20,085 |
| November 2025 | 1,852 |
| October 2025 | 2,750 |
| September 2025 | 12,436 |
| August 2025 | 20,083 |
| July 2025 | 10,407 |
| June 2025 | 12,135 |
| May 2025 | 8,264 |
| April 2025 | 24,993 |
| March 2025 | 3,193 |
| February 2025 | 12,834 |
| January 2025 | 4,166 |
| December 2024 | 2,681 |
| November 2024 | 33,218 |
| October 2024 | 16,480 |
| September 2024 | 14,194 |
| August 2024 | 14,058 |
| July 2024 | 25,635 |
| June 2024 | 13,437 |
| May 2024 | 8,885 |
| April 2024 | 15,899 |
| March 2024 | 1,753 |
| February 2024 | 731 |
| January 2024 | 26,015 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at Almond Power Plant, and when do they retire?
4 operable generators total 224 MW, with an average age of 17 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 1990s | 1 | 50 | 22% | none reported |
| 2010s | 3 | 174 | 78% | none reported |
Every generator, 4 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 1 | Operating | Natural Gas Fired Combustion Turbine | 50 | 1996 | n/a |
| 2 | Operating | Natural Gas Fired Combustion Turbine | 58 | 2012 | n/a |
| 3 | Operating | Natural Gas Fired Combustion Turbine | 58 | 2012 | n/a |
| 4 | Operating | Natural Gas Fired Combustion Turbine | 58 | 2012 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns Almond Power Plant?
EIA lists no joint owners for Almond Power Plant. Turlock Irrigation District operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What does Turlock Irrigation District charge homes?
Turlock Irrigation District, the operator of Almond Power Plant, had an average residential price of 17.40¢ per kWh and an average bill of $142 a month in 2025, 44% below the California average of 31.35¢.
| Measure | Price | Monthly bill | Against California |
|---|---|---|---|
| Turlock Irrigation District | 17.40¢ | $142 | 44% lower |
| California average | 31.35¢ | $155 | |
| U.S. average | 17.23¢ | $151 | 45% lower |
Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.
Where is Almond Power Plant?
Almond Power Plant is in Modesto, Stanislaus County, California, at 37.5744° N, 120.9850° W. It sits in the Turlock Irrigation District balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which natural gas plants in California are similar in size?
California has 304 operable natural gas plants with 40,211 MW of capacity, and Almond Power Plant's 224 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Crockett Cogen Project | Contra Costa | 247 | 1,275,138 |
| Midway Sunset Cogen | Kern | 234 | 47,263 |
| Roseville Energy Park | Placer | 225 | 461,905 |
| Almond Power Plant | Stanislaus | 224 | 133,198 |
| AES Huntington Beach LLC | Orange | 218 | 6,195 |
| Canyon Power Plant | Orange | 200 | 13,331 |
| Mariposa Energy Project | Alameda | 200 | 29,135 |
Source: EIA Forms EIA-860 and EIA-923, 2025.