Natural gas power plant, California
Mariposa Energy Project, California
Mariposa Energy Project is a 200 MW natural gas power plant in Alameda County, California, operated by Diamond Generating Corporation, and it generated 29,135 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 13th percentile of U.S. natural gas plants. By 2025 generation it ranks 4,787th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Mariposa Energy Project plant run compared with other natural gas plants?
The Mariposa Energy Project plant had a capacity factor of 2% in 2025 on 200 MW of net summer capacity, the 13th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 6 days at full output out of 365.
0%Shaded: the middle half of natural gas plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Mariposa Energy Project | 2% |
| Natural gas plants, 75th percentile | 56% |
| Natural gas plants, median | 22% |
| Natural gas plants, 25th percentile | 6% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Mariposa Energy Project plant generating more or less than last year?
Generation at Mariposa Energy Project fell 68.8% from 2024 to 2025, from 93,437 MWh to 29,135 MWh. Through August 2026 it is running 39.0% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 93,437 |
| 2025 | 29,135 |
| 2026 through August | 34,977 |
| 2025, same months | 25,171 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 12,703 |
| July 2026 | 7,940 |
| June 2026 | 186 |
| May 2026 | 3,625 |
| April 2026 | 705 |
| March 2026 | 4,496 |
| February 2026 | 861 |
| January 2026 | 4,461 |
| December 2025 | 71 |
| November 2025 | 838 |
| October 2025 | 0 |
| September 2025 | 3,055 |
| August 2025 | 3,891 |
| July 2025 | 564 |
| June 2025 | 1,716 |
| May 2025 | 3,630 |
| April 2025 | 1,491 |
| March 2025 | 973 |
| February 2025 | 10,841 |
| January 2025 | 2,065 |
| December 2024 | 2,117 |
| November 2024 | 5,142 |
| October 2024 | 9,889 |
| September 2024 | 7,084 |
| August 2024 | 7,534 |
| July 2024 | 18,729 |
| June 2024 | 5,200 |
| May 2024 | 2,639 |
| April 2024 | 2,071 |
| March 2024 | 4,830 |
| February 2024 | 709 |
| January 2024 | 27,493 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Mariposa Energy Project plant, and when do they retire?
4 operable generators total 200 MW, with an average age of 13 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 4 | 200 | 100% | none reported |
Every generator, 4 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| CTG1 | Operating | Natural Gas Fired Combustion Turbine | 50 | 2012 | n/a |
| CTG2 | Operating | Natural Gas Fired Combustion Turbine | 50 | 2012 | n/a |
| CTG3 | Operating | Natural Gas Fired Combustion Turbine | 50 | 2012 | n/a |
| CTG4 | Operating | Natural Gas Fired Combustion Turbine | 50 | 2012 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Mariposa Energy Project plant?
EIA lists no joint owners for Mariposa Energy Project. Diamond Generating Corporation operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Mariposa Energy Project plant?
Mariposa Energy Project is in Byron, Alameda County, California, at 37.7892° N, 121.6019° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which natural gas plants in California are similar in size?
California has 304 operable natural gas plants with 40,211 MW of capacity, and Mariposa Energy Project's 200 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Almond Power Plant | Stanislaus | 224 | 133,198 |
| AES Huntington Beach LLC | Orange | 218 | 6,195 |
| Canyon Power Plant | Orange | 200 | 13,331 |
| Mariposa Energy Project | Alameda | 200 | 29,135 |
| Woodland | Stanislaus | 199 | 281,638 |
| Riverside Energy Resource Center | Riverside | 196 | 16,844 |
| Procter & Gamble Power Plant | Sacramento | 193 | 553,438 |
Source: EIA Forms EIA-860 and EIA-923, 2025.