Riverside Energy Resource Center is a 196 MW natural gas power plant in Riverside County, California, operated by City of Riverside-(CA), and it generated 16,844 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 9th percentile of U.S. natural gas plants. By 2025 generation it ranks 5,441st of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

196 MWNameplate capacity
under 1%Capacity factor, 2025, 9th percentile, on 196 MW net summer
5,441stU.S. rank by generation, 2025
17 yearsAverage generator age, by MW

How hard does the Riverside Energy Resource Center plant run compared with other natural gas plants?

The Riverside Energy Resource Center plant had a capacity factor of under 1% in 2025 on 196 MW of net summer capacity, the 9th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. It ran for only a few hours of the year at full output.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Riverside Energy Resource Centerunder 1%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Riverside Energy Resource Center plant generating more or less than last year?

Generation at Riverside Energy Resource Center fell 76.6% from 2024 to 2025, from 71,950 MWh to 16,844 MWh.

Net generation by period
PeriodMWh
202471,950
202516,844
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20250
November 2025324
October 20251,185
September 20253,716
August 20256,229
July 2025379
June 2025261
May 20251,385
April 20251,831
March 2025994
February 2025153
January 2025387
December 202481
November 20241,102
October 20245,363
September 202411,167
August 202412,435
July 202422,460
June 20246,413
May 2024969
April 20242,331
March 2024621
February 2024456
January 20248,552

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Riverside Energy Resource Center plant?

Riverside Energy Resource Center made 0.0% of the 204,542,898 MWh reported by California plants in 2025, from 0.2% of the state's 107,433 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 137th largest of 1,877 plants in California, the 1,672nd largest of 14,327 in the U.S. and the 717th largest of 1,962 natural gas plants. By 2025 generation it is the 707th largest of 1,608 generating plants in the state.

Riverside Energy Resource Center within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)196107,4330.2%
Generation (MWh)16,844204,542,8980.0%
Natural gas capacity (MW)19640,2110.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Riverside Energy Resource Center plant, and when do they retire?

4 operable generators total 196 MW, with an average age of 17 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s210051%none reported
2010s29649%none reported
Every generator, 4 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingNatural Gas Fired Combustion Turbine502006n/a
2OperatingNatural Gas Fired Combustion Turbine502006n/a
3OperatingNatural Gas Fired Combustion Turbine482011n/a
4OperatingNatural Gas Fired Combustion Turbine482011n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Riverside Energy Resource Center plant?

EIA lists no joint owners for Riverside Energy Resource Center. City of Riverside-(CA) operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does City of Riverside charge homes?

City of Riverside, the operator of Riverside Energy Resource Center, had an average residential price of 21.94¢ per kWh and an average bill of $135 a month in 2025, 30% below the California average of 31.35¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst California
City of Riverside21.94¢$13530% lower
California average31.35¢$155
U.S. average17.23¢$15145% lower

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Riverside Energy Resource Center plant?

Riverside Energy Resource Center is in Riverside, Riverside County, California, at 33.9636° N, 117.4528° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in California are similar in size?

California has 304 operable natural gas plants with 40,211 MW of capacity, and Riverside Energy Resource Center's 196 MW is 0% of that.

Natural gas plants in California around this size
PlantCountyMW2025 MWh
Canyon Power PlantOrange20013,331
Mariposa Energy ProjectAlameda20029,135
WoodlandStanislaus199281,638
Riverside Energy Resource CenterRiverside19616,844
Procter & Gamble Power PlantSacramento193553,438
Redding PowerShasta183189,278
El Segundo CogenLos Angeles1801,212,541