Natural gas power plant, California

Woodland natural gas power plant, California

Woodland is a 199 MW natural gas power plant in Stanislaus County, California, operated by Modesto Irrigation District, and it generated 281,638 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in California, and its capacity factor sits at the 46th percentile of U.S. natural gas plants. By 2025 generation it ranks 2,057th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

199 MWNameplate capacity
18%Capacity factor, 2025, 46th percentile, on 177 MW net summer
0.1%Of CA generation, 2025
23 yearsAverage generator age, by MW

How hard does the Woodland plant run compared with other natural gas plants?

The Woodland plant had a capacity factor of 18% in 2025 on 177 MW of net summer capacity, the 46th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 66 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Woodland18%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Woodland plant generating more or less than last year?

Generation at Woodland rose 3.6% from 2024 to 2025, from 271,941 MWh to 281,638 MWh. Through August 2026 it is running 4.2% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024271,941
2025281,638
2026 through August189,679
2025, same months182,019
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202632,095
July 202630,399
June 202618,809
May 202621,345
April 202620,938
March 202622,109
February 202618,828
January 202625,156
December 202521,817
November 202521,622
October 202525,280
September 202530,900
August 202528,079
July 202524,326
June 202522,665
May 202521,138
April 202514,903
March 202523,935
February 202523,080
January 202523,893
December 202417,802
November 202417,788
October 202420,455
September 202427,205
August 202423,544
July 202431,950
June 202425,829
May 202419,171
April 202423,563
March 202423,443
February 202415,968
January 202425,223

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Woodland plant?

Woodland made 0.1% of the 204,542,898 MWh reported by California plants in 2025, from 0.2% of the state's 107,433 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 135th largest of 1,877 plants in California, the 1,649th largest of 14,327 in the U.S. and the 715th largest of 1,962 natural gas plants. By 2025 generation it is the 186th largest of 1,608 generating plants in the state.

Woodland within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)199107,4330.2%
Generation (MWh)281,638204,542,8980.1%
Natural gas capacity (MW)19940,2110.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Woodland plant, and when do they retire?

9 operable generators total 199 MW, with an average age of 23 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1990s15025%none reported
2000s29849%none reported
2010s65025%none reported
Every generator, 9 in all
UnitStatusTechnologyMWIn servicePlanned retirement
NA1OperatingNatural Gas Fired Combustion Turbine501993n/a
2OperatingNatural Gas Fired Combined Cycle382003n/a
3OperatingNatural Gas Fired Combined Cycle612003n/a
3AOperatingNatural Gas Internal Combustion Engine82011n/a
3BOperatingNatural Gas Internal Combustion Engine82011n/a
3COperatingNatural Gas Internal Combustion Engine82011n/a
3DOperatingNatural Gas Internal Combustion Engine82011n/a
3EOperatingNatural Gas Internal Combustion Engine82011n/a
3FOperatingNatural Gas Internal Combustion Engine82011n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Woodland plant?

EIA lists no joint owners for Woodland. Modesto Irrigation District operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Modesto Irrigation District charge homes?

Modesto Irrigation District, the operator of Woodland, had an average residential price of 23.03¢ per kWh and an average bill of $173 a month in 2025, 27% below the California average of 31.35¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst California
Modesto Irrigation District23.03¢$17327% lower
California average31.35¢$155
U.S. average17.23¢$15145% lower

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Woodland plant?

Woodland is in Modesto, Stanislaus County, California, at 37.6526° N, 121.0204° W. It sits in the Balancing Authority of Northern California balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in California are similar in size?

California has 304 operable natural gas plants with 40,211 MW of capacity, and Woodland's 199 MW is 0% of that.

Natural gas plants in California around this size
PlantCountyMW2025 MWh
AES Huntington Beach LLCOrange2186,195
Canyon Power PlantOrange20013,331
Mariposa Energy ProjectAlameda20029,135
WoodlandStanislaus199281,638
Riverside Energy Resource CenterRiverside19616,844
Procter & Gamble Power PlantSacramento193553,438
Redding PowerShasta183189,278