Solar power plant, South Carolina
Lone Star Solar power plant, South Carolina
Lone Star Solar is a 132 MW power plant, 66 MW of it solar, in Calhoun County, South Carolina, operated by Lone Star Solar, and it generated 163,965 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in South Carolina, and its capacity factor sits at the 85th percentile of U.S. solar plants. By 2025 generation it ranks 2,772nd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Lone Star Solar plant run compared with other solar plants?
The Lone Star Solar plant's solar units had a capacity factor of 29% in 2025 on 66 MW of net summer capacity, the 85th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 105 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Lone Star Solar | 29% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.
Is the Lone Star Solar plant generating more or less than last year?
Lone Star Solar generated 163,965 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 11.8% ahead of the same months of 2025. 2024 has output for only 1 month, so the two years are not compared.
| Period | MWh |
|---|---|
| 2024 | 4,814 |
| 2025 | 163,965 |
| 2026 through August | 128,935 |
| 2025, same months | 115,375 |
Monthly generation, Dec 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 16,803 |
| July 2026 | 21,223 |
| June 2026 | 19,685 |
| May 2026 | 14,833 |
| April 2026 | 19,786 |
| March 2026 | 17,310 |
| February 2026 | 9,924 |
| January 2026 | 9,371 |
| December 2025 | 7,914 |
| November 2025 | 12,455 |
| October 2025 | 12,974 |
| September 2025 | 15,247 |
| August 2025 | 15,195 |
| July 2025 | 19,146 |
| June 2025 | 20,518 |
| May 2025 | 17,016 |
| April 2025 | 17,869 |
| March 2025 | 15,045 |
| February 2025 | 7,225 |
| January 2025 | 3,361 |
| December 2024 | 4,814 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Lone Star Solar plant, and when do they retire?
2 operable generators total 132 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 2 | 132 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 49 | Operating | Solar Photovoltaic | 66 | 2024 | n/a |
| 50 | Operating | Batteries | 66 | 2024 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Lone Star Solar plant?
EIA lists no joint owners for Lone Star Solar. Lone Star Solar operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What fuels does the Lone Star Solar plant use?
Lone Star Solar has capacity on 2 fuels: 50% solar and 50% battery and pumped storage. In 2025, solar made 101% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Solar | 66 | 50.0% | 165,588 |
| Battery and pumped storage | 66 | 50.0% | -1,623 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the Lone Star Solar plant?
Lone Star Solar is in Cameron, Calhoun County, South Carolina, at 33.6488° N, 80.6391° W. It sits in the Dominion Energy South Carolina balancing area (NERC region SERC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in South Carolina are similar in size?
South Carolina has 126 operable solar plants with 1,956 MW of capacity, and Lone Star Solar's 66 MW is 3% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Midlands | Calhoun | 72 | 156,169 |
| Moffett Solar Project | Jasper | 71 | 138,476 |
| Lily Solar | Allendale | 70 | 161,974 |
| Lone Star Solar | Calhoun | 66 | 165,588 |
| Landrace Holdings, LLC | Horry | 55 | 114,525 |
| Peony Solar | Orangeburg | 39 | 71,391 |
Source: EIA Forms EIA-860 and EIA-923, 2025.