Skip to main content
RateWatt

Solar power plant, South Carolina

Lone Star Solar power plant, South Carolina

Lone Star Solar is a 132 MW power plant, 66 MW of it solar, in Calhoun County, South Carolina, operated by Lone Star Solar, and it generated 163,965 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in South Carolina, and its capacity factor sits at the 85th percentile of U.S. solar plants. By 2025 generation it ranks 2,772nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

132 MWNameplate capacity
29%Capacity factor, 2025, solar units, 85th percentile, on 66 MW net summer
0.2%Of SC generation, 2025
1 yearAverage generator age, by MW

How hard does the Lone Star Solar plant run compared with other solar plants?

The Lone Star Solar plant's solar units had a capacity factor of 29% in 2025 on 66 MW of net summer capacity, the 85th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 105 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Lone Star Solar29%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Lone Star Solar plant generating more or less than last year?

Lone Star Solar generated 163,965 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 11.8% ahead of the same months of 2025. 2024 has output for only 1 month, so the two years are not compared.

Net generation by period
PeriodMWh
20244,814
2025163,965
2026 through August128,935
2025, same months115,375
Monthly generation, Dec 2024 to Aug 2026
MonthMWh
August 202616,803
July 202621,223
June 202619,685
May 202614,833
April 202619,786
March 202617,310
February 20269,924
January 20269,371
December 20257,914
November 202512,455
October 202512,974
September 202515,247
August 202515,195
July 202519,146
June 202520,518
May 202517,016
April 202517,869
March 202515,045
February 20257,225
January 20253,361
December 20244,814

Source: EIA Form EIA-923, through August 2026.

How much of South Carolina's electricity comes from the Lone Star Solar plant?

Lone Star Solar made 0.2% of the 103,930,530 MWh reported by South Carolina plants in 2025, from 0.5% of the state's 27,220 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 27th largest of 215 plants in South Carolina, the 2,191st largest of 14,327 in the U.S. and the 786th largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 26th largest of 197 generating plants in the state.

Lone Star Solar within South Carolina, 2025
MeasureThis plantSouth CarolinaShare
Capacity (MW)13227,2200.5%
Generation (MWh)163,965103,930,5300.2%
Solar capacity (MW)661,9563.4%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Lone Star Solar plant, and when do they retire?

2 operable generators total 132 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s2132100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
49OperatingSolar Photovoltaic662024n/a
50OperatingBatteries662024n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Lone Star Solar plant?

EIA lists no joint owners for Lone Star Solar. Lone Star Solar operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Lone Star Solar plant use?

Lone Star Solar has capacity on 2 fuels: 50% solar and 50% battery and pumped storage. In 2025, solar made 101% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar6650.0%165,588
Battery and pumped storage6650.0%-1,623

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Lone Star Solar plant?

Lone Star Solar is in Cameron, Calhoun County, South Carolina, at 33.6488° N, 80.6391° W. It sits in the Dominion Energy South Carolina balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in South Carolina are similar in size?

South Carolina has 126 operable solar plants with 1,956 MW of capacity, and Lone Star Solar's 66 MW is 3% of that.

Solar plants in South Carolina around this size
PlantCountyMW2025 MWh
MidlandsCalhoun72156,169
Moffett Solar ProjectJasper71138,476
Lily SolarAllendale70161,974
Lone Star SolarCalhoun66165,588
Landrace Holdings, LLCHorry55114,525
Peony SolarOrangeburg3971,391

Source: EIA Forms EIA-860 and EIA-923, 2025.