Wind power plant, Texas
Los Vientos V Wind Power power plant, Texas
Los Vientos V Wind Power is a 110 MW wind power plant in Starr County, Texas, operated by Deriva Energy, and it generated 261,048 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 29th percentile of U.S. wind plants. By 2025 generation it ranks 2,157th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Los Vientos V Wind Power plant run compared with other wind plants?
The Los Vientos V Wind Power plant had a capacity factor of 27% in 2025 on 110 MW of net summer capacity, the 29th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 99 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Los Vientos V Wind Power | 27% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Los Vientos V Wind Power plant generating more or less than last year?
Generation at Los Vientos V Wind Power rose 11.7% from 2024 to 2025, from 233,607 MWh to 261,048 MWh.
| Period | MWh |
|---|---|
| 2024 | 233,607 |
| 2025 | 261,048 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 15,426 |
| November 2025 | 23,352 |
| October 2025 | 15,431 |
| September 2025 | 12,699 |
| August 2025 | 11,067 |
| July 2025 | 31,750 |
| June 2025 | 27,116 |
| May 2025 | 29,344 |
| April 2025 | 26,509 |
| March 2025 | 35,677 |
| February 2025 | 19,874 |
| January 2025 | 12,803 |
| December 2024 | 5,872 |
| November 2024 | 9,700 |
| October 2024 | 11,776 |
| September 2024 | 7,265 |
| August 2024 | 12,038 |
| July 2024 | 22,007 |
| June 2024 | 24,683 |
| May 2024 | 30,981 |
| April 2024 | 32,369 |
| March 2024 | 27,448 |
| February 2024 | 28,952 |
| January 2024 | 20,516 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Los Vientos V Wind Power plant, and when do they retire?
1 operable generator totals 110 MW, with an average age of 10 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 110 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 1 | Operating | Onshore Wind Turbine | 110 | 2015 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Los Vientos V Wind Power plant?
Los Vientos Windpower V, LLC is the only joint owner reported for Los Vientos V Wind Power, with 100.0%. Deriva Energy operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Los Vientos V Wind Power plant?
Los Vientos V Wind Power is in Rio Grande City, Starr County, Texas, at 26.4117° N, 98.5716° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Texas are similar in size?
Texas has 228 operable wind plants with 43,942 MW of capacity, and Los Vientos V Wind Power's 110 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Great Plains Windpark LLC | Hansford | 114 | 89,157 |
| Wolf Ridge Wind | Cooke | 113 | 354,986 |
| Keechi Wind | Jack | 110 | 390,565 |
| Los Vientos V Wind Power | Starr | 110 | 261,048 |
| South Trent Wind Farm | Nolan | 101 | 272,339 |
| Buckthorn Wind | Erath | 101 | 359,571 |
| Anacacho Wind Farm, LLC | Kinney | 100 | 324,269 |
Source: EIA Forms EIA-860 and EIA-923, 2025.