Wolf Ridge Wind is a 113 MW wind power plant in Cooke County, Texas, operated by NextEra Wolf Ridge LLC, and it generated 354,986 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 60th percentile of U.S. wind plants. By 2025 generation it ranks 1,755th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Wolf Ridge Wind plant run compared with other wind plants?
The Wolf Ridge Wind plant had a capacity factor of 36% in 2025 on 113 MW of net summer capacity, the 60th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 131 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Wolf Ridge Wind | 36% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Wolf Ridge Wind plant generating more or less than last year?
Generation at Wolf Ridge Wind fell 5.2% from 2024 to 2025, from 374,548 MWh to 354,986 MWh.
| Period | MWh |
|---|---|
| 2024 | 374,548 |
| 2025 | 354,986 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 30,319 |
| November 2025 | 30,305 |
| October 2025 | 27,917 |
| September 2025 | 19,328 |
| August 2025 | 17,461 |
| July 2025 | 26,250 |
| June 2025 | 29,982 |
| May 2025 | 25,554 |
| April 2025 | 38,447 |
| March 2025 | 50,229 |
| February 2025 | 27,876 |
| January 2025 | 31,318 |
| December 2024 | 30,498 |
| November 2024 | 33,974 |
| October 2024 | 32,829 |
| September 2024 | 13,756 |
| August 2024 | 25,063 |
| July 2024 | 22,852 |
| June 2024 | 27,776 |
| May 2024 | 30,930 |
| April 2024 | 43,422 |
| March 2024 | 41,509 |
| February 2024 | 39,994 |
| January 2024 | 31,945 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Wolf Ridge Wind plant, and when do they retire?
1 operable generator totals 113 MW, with an average age of 17 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2000s | 1 | 113 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 1 | Operating | Onshore Wind Turbine | 113 | 2008 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Wolf Ridge Wind plant?
EIA lists no joint owners for Wolf Ridge Wind. NextEra Wolf Ridge LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Wolf Ridge Wind plant?
Wolf Ridge Wind is in Muenster, Cooke County, Texas, at 33.7330° N, 97.4284° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Texas are similar in size?
Texas has 228 operable wind plants with 43,942 MW of capacity, and Wolf Ridge Wind's 113 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Ranchland Wind Project I | Callahan | 115 | 437,228 |
| Callahan Divide Wind Energy Center | Taylor | 114 | 422,033 |
| Great Plains Windpark LLC | Hansford | 114 | 89,157 |
| Wolf Ridge Wind | Cooke | 113 | 354,986 |
| Keechi Wind | Jack | 110 | 390,565 |
| Los Vientos V Wind Power | Starr | 110 | 261,048 |
| South Trent Wind Farm | Nolan | 101 | 272,339 |
Source: EIA Forms EIA-860 and EIA-923, 2025.