Skip to main content
RateWatt

Wind power plant, Texas

Callahan Divide Wind Energy Center, Texas

Callahan Divide Wind Energy Center is a 114 MW wind power plant in Taylor County, Texas, operated by FPL Energy Callahan Wind, LLC, and it generated 422,033 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 83rd percentile of U.S. wind plants. By 2025 generation it ranks 1,528th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

114 MWNameplate capacity
42%Capacity factor, 2025, 83rd percentile, on 114 MW net summer
0.1%Of TX generation, 2025
20 yearsAverage generator age, by MW

How hard does the Callahan Divide Wind Energy Center plant run compared with other wind plants?

The Callahan Divide Wind Energy Center plant had a capacity factor of 42% in 2025 on 114 MW of net summer capacity, the 83rd percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 154 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Callahan Divide Wind Energy Center42%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Callahan Divide Wind Energy Center plant generating more or less than last year?

Generation at Callahan Divide Wind Energy Center rose 1.9% from 2024 to 2025, from 414,319 MWh to 422,033 MWh.

Net generation by period
PeriodMWh
2024414,319
2025422,033
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202542,481
November 202536,166
October 202536,620
September 202526,135
August 202525,613
July 202533,001
June 202535,085
May 202529,907
April 202542,807
March 202545,609
February 202532,893
January 202535,716
December 202432,348
November 202439,083
October 202438,921
September 202419,269
August 202428,138
July 202430,433
June 202442,204
May 202438,397
April 202440,141
March 202433,368
February 202441,099
January 202430,918

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Callahan Divide Wind Energy Center plant?

Callahan Divide Wind Energy Center made 0.1% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.1% of the state's 195,966 MW of capacity. Its share of output is 1.2 times its share of capacity. By capacity it is the 479th largest of 1,023 plants in Texas, the 2,396th largest of 14,327 in the U.S. and the 580th largest of 1,358 wind plants. By 2025 generation it is the 316th largest of 816 generating plants in the state.

Callahan Divide Wind Energy Center within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)114195,9660.1%
Generation (MWh)422,033592,896,1760.1%
Wind capacity (MW)11443,9420.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Callahan Divide Wind Energy Center plant, and when do they retire?

1 operable generator totals 114 MW, with an average age of 20 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s1114100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingOnshore Wind Turbine1142005n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Callahan Divide Wind Energy Center plant?

EIA lists no joint owners for Callahan Divide Wind Energy Center. FPL Energy Callahan Wind, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Callahan Divide Wind Energy Center plant?

Callahan Divide Wind Energy Center is in Tusocola, Taylor County, Texas, at 32.3039° N, 100.0217° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Texas are similar in size?

Texas has 228 operable wind plants with 43,942 MW of capacity, and Callahan Divide Wind Energy Center's 114 MW is 0% of that.

Wind plants in Texas around this size
PlantCountyMW2025 MWh
Barton Chapel Wind FarmJack120127,489
Panther Creek Wind Farm IIGlasscock116411,264
Ranchland Wind Project ICallahan115437,228
Callahan Divide Wind Energy CenterTaylor114422,033
Great Plains Windpark LLCHansford11489,157
Wolf Ridge WindCooke113354,986
Keechi WindJack110390,565

Source: EIA Forms EIA-860 and EIA-923, 2025.