Wind power plant, Texas
Barton Chapel Wind Farm, Texas
Barton Chapel Wind Farm is a 120 MW wind power plant in Jack County, Texas, operated by Avangrid Power LLC, and it generated 127,489 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 4th percentile of U.S. wind plants. By 2025 generation it ranks 3,127th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Barton Chapel Wind Farm plant run compared with other wind plants?
The Barton Chapel Wind Farm plant had a capacity factor of 12% in 2025 on 120 MW of net summer capacity, the 4th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 44 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Barton Chapel Wind Farm | 12% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Barton Chapel Wind Farm plant generating more or less than last year?
Generation at Barton Chapel Wind Farm fell 39.5% from 2024 to 2025, from 210,862 MWh to 127,489 MWh.
| Period | MWh |
|---|---|
| 2024 | 210,862 |
| 2025 | 127,489 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 13,333 |
| November 2025 | 8,219 |
| October 2025 | 9,547 |
| September 2025 | 7,327 |
| August 2025 | 7,272 |
| July 2025 | 9,026 |
| June 2025 | 8,970 |
| May 2025 | 5,974 |
| April 2025 | 15,967 |
| March 2025 | 13,918 |
| February 2025 | 13,036 |
| January 2025 | 14,900 |
| December 2024 | 18,638 |
| November 2024 | 18,595 |
| October 2024 | 20,465 |
| September 2024 | 10,269 |
| August 2024 | 14,718 |
| July 2024 | 12,811 |
| June 2024 | 14,217 |
| May 2024 | 17,103 |
| April 2024 | 23,541 |
| March 2024 | 19,808 |
| February 2024 | 22,623 |
| January 2024 | 18,074 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Barton Chapel Wind Farm plant, and when do they retire?
1 operable generator totals 120 MW, with an average age of 16 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2000s | 1 | 120 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| BC | Operating | Onshore Wind Turbine | 120 | 2009 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Barton Chapel Wind Farm plant?
EIA lists no joint owners for Barton Chapel Wind Farm. Avangrid Power LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Barton Chapel Wind Farm plant?
Barton Chapel Wind Farm is in Jacksboro, Jack County, Texas, at 33.0522° N, 98.3284° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Texas are similar in size?
Texas has 228 operable wind plants with 43,942 MW of capacity, and Barton Chapel Wind Farm's 120 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Stanton Wind Energy LLC | Martin | 120 | 279,898 |
| Scurry County Wind II | Scurry | 120 | 206,616 |
| Gunsight Mountain Wind Energy LLC | Howard | 120 | 430,635 |
| Barton Chapel Wind Farm | Jack | 120 | 127,489 |
| Panther Creek Wind Farm II | Glasscock | 116 | 411,264 |
| Ranchland Wind Project I | Callahan | 115 | 437,228 |
| Callahan Divide Wind Energy Center | Taylor | 114 | 422,033 |
Source: EIA Forms EIA-860 and EIA-923, 2025.