Ranchland Wind Project I power plant, Texas

Ranchland Wind Project I is a 115 MW wind power plant in Callahan County, Texas, operated by Ranchland Wind Project I, LLC, and it generated 437,228 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 87th percentile of U.S. wind plants. By 2025 generation it ranks 1,492nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

115 MWNameplate capacity
43%Capacity factor, 2025, 87th percentile, on 115 MW net summer
0.1%Of TX generation, 2025
1 yearAverage generator age, by MW

How hard does the Ranchland Wind Project I plant run compared with other wind plants?

The Ranchland Wind Project I plant had a capacity factor of 43% in 2025 on 115 MW of net summer capacity, the 87th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 159 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Ranchland Wind Project I43%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Ranchland Wind Project I plant generating more or less than last year?

Generation at Ranchland Wind Project I rose 7.9% from 2024 to 2025, from 405,399 MWh to 437,228 MWh. Through August 2026 it is running 6.2% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024405,399
2025437,228
2026 through August310,712
2025, same months292,523
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202630,792
July 202632,283
June 202642,570
May 202635,135
April 202644,294
March 202652,817
February 202633,961
January 202638,860
December 202543,074
November 202537,314
October 202538,497
September 202525,820
August 202525,488
July 202534,071
June 202539,809
May 202532,217
April 202544,631
March 202548,519
February 202533,477
January 202534,311
December 202435,492
November 202439,772
October 202437,815
September 202414,181
August 202431,371
July 202431,185
June 202437,736
May 202436,048
April 202440,059
March 202432,355
February 202438,242
January 202431,143

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Ranchland Wind Project I plant?

Ranchland Wind Project I made 0.1% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.1% of the state's 195,966 MW of capacity. Its share of output is 1.3 times its share of capacity. By capacity it is the 478th largest of 1,023 plants in Texas, the 2,390th largest of 14,327 in the U.S. and the 579th largest of 1,358 wind plants. By 2025 generation it is the 308th largest of 816 generating plants in the state.

Ranchland Wind Project I within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)115195,9660.1%
Generation (MWh)437,228592,896,1760.1%
Wind capacity (MW)11543,9420.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Ranchland Wind Project I plant, and when do they retire?

1 operable generator totals 115 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1115100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
WT2OperatingOnshore Wind Turbine1152024n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Ranchland Wind Project I plant?

EIA lists no joint owners for Ranchland Wind Project I. Ranchland Wind Project I, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Ranchland Wind Project I plant?

Ranchland Wind Project I is in Cisco, Callahan County, Texas, at 32.3085° N, 99.1645° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Texas are similar in size?

Texas has 228 operable wind plants with 43,942 MW of capacity, and Ranchland Wind Project I's 115 MW is 0% of that.

Wind plants in Texas around this size
PlantCountyMW2025 MWh
Gunsight Mountain Wind Energy LLCHoward120430,635
Barton Chapel Wind FarmJack120127,489
Panther Creek Wind Farm IIGlasscock116411,264
Ranchland Wind Project ICallahan115437,228
Callahan Divide Wind Energy CenterTaylor114422,033
Great Plains Windpark LLCHansford11489,157
Wolf Ridge WindCooke113354,986

Source: EIA Forms EIA-860 and EIA-923, 2025.