Hydro power plant, Idaho
Lucky Peak Power Plant Project, Idaho
Lucky Peak Power Plant Project is a 101 MW hydro power plant in Ada County, Idaho, operated by Boise-Kuna Irrigation District, and it generated 311,167 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.5% of the generation reported in Idaho, and its capacity factor sits at the 73rd percentile of U.S. hydro plants. By 2025 generation it ranks 1,929th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Lucky Peak Power Plant Project plant run compared with other hydro plants?
The Lucky Peak Power Plant Project plant had a capacity factor of 43% in 2025 on 83 MW of net summer capacity, the 73rd percentile of the 427 U.S. hydro plants with at least 20 MW. The typical hydro plant reached 33%. That equals about 156 days at full output out of 365.
0%Shaded: the middle half of hydro plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Lucky Peak Power Plant Project | 43% |
| Hydro plants, 75th percentile | 44% |
| Hydro plants, median | 33% |
| Hydro plants, 25th percentile | 22% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Lucky Peak Power Plant Project plant generating more or less than last year?
Generation at Lucky Peak Power Plant Project rose 7.1% from 2024 to 2025, from 290,591 MWh to 311,167 MWh.
| Period | MWh |
|---|---|
| 2024 | 290,591 |
| 2025 | 311,167 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 1,436 |
| November 2025 | 424 |
| October 2025 | 3,697 |
| September 2025 | 27,994 |
| August 2025 | 46,519 |
| July 2025 | 50,026 |
| June 2025 | 54,236 |
| May 2025 | 48,161 |
| April 2025 | 54,201 |
| March 2025 | 22,256 |
| February 2025 | 1,334 |
| January 2025 | 883 |
| December 2024 | 1,287 |
| November 2024 | 1,063 |
| October 2024 | 3,444 |
| September 2024 | 16,739 |
| August 2024 | 35,932 |
| July 2024 | 49,263 |
| June 2024 | 58,732 |
| May 2024 | 60,106 |
| April 2024 | 55,281 |
| March 2024 | 5,714 |
| February 2024 | 1,553 |
| January 2024 | 1,477 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Lucky Peak Power Plant Project plant, and when do they retire?
3 operable generators total 101 MW, with an average age of 37 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 1980s | 3 | 101 | 100% | none reported |
Every generator, 3 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| U131 | Operating | Conventional Hydroelectric | 45 | 1988 | n/a |
| U132 | Operating | Conventional Hydroelectric | 45 | 1988 | n/a |
| U133 | Operating | Conventional Hydroelectric | 11 | 1988 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Lucky Peak Power Plant Project plant?
EIA lists no joint owners for Lucky Peak Power Plant Project. Boise-Kuna Irrigation District operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Lucky Peak Power Plant Project plant?
Lucky Peak Power Plant Project is in Boise, Ada County, Idaho, at 43.5280° N, 116.0583° W. It sits in the Idaho Power Company balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which hydro plants in Idaho are similar in size?
Idaho has 76 operable hydro plants with 2,696 MW of capacity, and Lucky Peak Power Plant Project's 101 MW is 4% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Palisades Dam | Bonneville | 176 | 657,316 |
| Lucky Peak Power Plant Project | Ada | 101 | 311,167 |
| American Falls | Power | 92 | 206,286 |
| C J Strike | Owyhee | 83 | 364,143 |
| Bliss (ID) | Gooding | 75 | 297,712 |
Source: EIA Forms EIA-860 and EIA-923, 2025.