ID power plants
Power plants in Idaho
Idaho has 153 operable power plants with 6.4 GW of nameplate capacity (Form EIA-860, 2025). The largest is Brownlee, at 675 MW, and hydro has the most capacity, 42% of the state total.
What fuels do Idaho's power plants use?
Hydro makes up 42% of Idaho's capacity, and natural gas 20%. The largest share of 2025 generation came from hydro, at 43.6%.
| Fuel | Plants | Capacity | Share | 2025 MWh | Share |
|---|---|---|---|---|---|
| Hydro | 76 | 2,696 MW | 41.9% | 8,841,596 | 43.6% |
| Natural gas | 8 | 1,257 MW | 19.5% | 6,296,054 | 31.1% |
| Wind | 33 | 1,132 MW | 17.6% | 2,825,418 | 13.9% |
| Solar | 13 | 702 MW | 10.9% | 1,627,956 | 8.0% |
| Battery and pumped storage | 9 | 459 MW | 7.1% | -40,243 | -0.2% |
| Biomass | 11 | 148 MW | 2.3% | 571,198 | 2.8% |
| Geothermal | 1 | 16 MW | 0.2% | 88,141 | 0.4% |
| Other-fuel | 1 | 15.9 MW | 0.2% | 66,124 | 0.3% |
| Petroleum | 1 | 5 MW | 0.1% | 36 | 0.0% |
Source: EIA Forms EIA-860 and EIA-923, 2025.
What power plants are in Idaho?
The 10 largest of Idaho's 153 plants hold 47% of its capacity, and half of the plants are 13.5 MW or smaller.
| Plant | Fuel | County | MW | 2025 MWh |
|---|---|---|---|---|
| Brownlee | Hydro | Washington | 675 | 2,255,563 |
| Dworshak | Hydro | Clearwater | 465 | 1,516,661 |
| Langley Gulch Power Plant | Natural gas | Payette | 319 | 1,755,150 |
| Rathdrum Power LLC | Natural gas | Kootenai | 302 | 1,715,114 |
| Evander Andrews Power Complex | Natural gas | Elmore | 271 | 926,368 |
| Cabinet Gorge | Hydro | Bonner | 265 | 886,290 |
| Matrix Pleasant Valley | Solar | Ada | 200 | 460,067 |
| Palisades Dam | Hydro | Bonneville | 176 | 657,316 |
| Bennett Mountain | Natural gas | Elmore | 173 | 999,149 |
| Rathdrum | Natural gas | Kootenai | 166 | 793,245 |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity is nameplate of operable generators. Ranks 1 to 10 run from 675 MW at Brownlee to 166 MW at Rathdrum.
| Plant | Fuel | County | MW | 2025 MWh |
|---|---|---|---|---|
| Cedar Creek Wind, LLC | Wind | Bingham | 160 | 455,244 |
| Kuna BESS | Battery and pumped storage | Ada | 150 | -13,915 |
| Goshen Phase II | Wind | Bonneville | 125 | 337,116 |
| Jackpot Solar, LLC | Solar | Twin Falls | 120 | 274,519 |
| Meadow Creek Project Company | Wind | Bonneville | 120 | 292,277 |
| Hemmingway BESS | Battery and pumped storage | Owyhee | 116 | -6,501 |
| Clearwater Paper IPP Lewiston | Biomass | Nez Perce | 114 | 462,919 |
| Lucky Peak Power Plant Project | Hydro | Ada | 101 | 311,167 |
| Franklin Solar Hybrid | Solar | Twin Falls | 100 | 252,389 |
| American Falls | Hydro | Power | 92.4 | 206,286 |
| C J Strike | Hydro | Owyhee | 82.8 | 364,143 |
| Happy Valley Battery Storage | Battery and pumped storage | Canyon | 82 | -6,807 |
| Grand View Solar Two | Solar | Elmore | 80 | 183,722 |
| Rockland Wind Farm | Wind | Power | 79.2 | 219,376 |
| Bliss (ID) | Hydro | Gooding | 75 | 297,712 |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity is nameplate of operable generators. Ranks 11 to 25 run from 160 MW at Cedar Creek Wind, LLC to 75 MW at Bliss (ID).
| Plant | Fuel | County | MW | 2025 MWh |
|---|---|---|---|---|
| Wolverine Creek | Wind | Bonneville | 64.5 | 143,680 |
| Lower Salmon | Hydro | Gooding | 60 | 196,749 |
| Franklin Battery Storage | Battery and pumped storage | Twin Falls | 60 | -8,975 |
| Milner Hydro | Hydro | Cassia | 59.5 | 33,693 |
| Horse Butte Wind I, LLC | Wind | Bonneville | 57.6 | 157,956 |
| Twin Falls (ID) | Hydro | Twin Falls | 52.7 | 43,524 |
| Albeni Falls | Hydro | Bonner | 42 | 177,047 |
| Anderson Ranch | Hydro | Elmore | 40 | 85,803 |
| High Mesa | Wind | Twin Falls | 40 | 76,378 |
| ID Solar | Solar | Ada | 40 | 92,218 |
| Black Mesa BESS | Battery and pumped storage | Elmore | 40 | -3,177 |
| Black Mesa Solar, LLC | Solar | Elmore | 40 | 89,175 |
| Smith Falls Hydro Project | Hydro | Boundary | 38.1 | 87,180 |
| Grace | Hydro | Caribou | 33 | 82,687 |
| Oneida | Hydro | Franklin | 30 | 39,401 |
| Minidoka | Hydro | Minidoka | 27.7 | 98,814 |
| Swan Falls | Hydro | Ada | 27.2 | 110,047 |
| Gem State | Hydro | Bonneville | 23.4 | 117,220 |
| Ryegrass Windfarm | Wind | Elmore | 23 | 48,676 |
| Hammett Hill Windfarm | Wind | Elmore | 23 | 53,080 |
| Mainline Windfarm | Wind | Elmore | 23 | 52,218 |
| Desert Meadow Windfarm | Wind | Elmore | 23 | 54,261 |
| Cold Springs Windfarm | Wind | Elmore | 23 | 46,612 |
| Two Ponds Windfarm | Wind | Elmore | 23 | 55,174 |
| Camp Reed | Wind | Elmore | 22.5 | 59,005 |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity is nameplate of operable generators. Ranks 26 to 50 run from 64.5 MW at Wolverine Creek to 22.5 MW at Camp Reed.
| Plant | Fuel | County | MW | 2025 MWh |
|---|---|---|---|---|
| Power County Wind Park South | Wind | Power | 22.5 | 56,756 |
| Power County Wind Park North | Wind | Power | 22.5 | 63,858 |
| Sawtooth Wind Project | Wind | Elmore | 22.4 | 49,850 |
| Burley Butte Windpark | Wind | Cassia | 21.3 | 55,989 |
| Salmon Falls Wind Park | Wind | Twin Falls | 21 | 58,267 |
| Mountain Home | Wind | Elmore | 21 | 33,053 |
| Bennett Creek Windfarm LLC - Mountain Home | Wind | Elmore | 21 | 36,928 |
| Payne's Ferry | Wind | Twin Falls | 21 | 59,240 |
| Yahoo Creek | Wind | Twin Falls | 21 | 58,795 |
| Mt. Home Solar 1, LLC | Solar | Elmore | 20 | 48,506 |
| Murphy Flat Solar | Solar | Owyhee | 20 | 40,933 |
| Orchard Ranch Solar | Solar | Ada | 20 | 45,737 |
| American Falls Solar | Solar | Power | 20 | 43,884 |
| American Falls Solar II | Solar | Power | 20 | 45,371 |
| Simcoe Solar | Solar | Elmore | 20 | 48,877 |
| Milner Dam Wind Park LLC | Wind | Cassia | 19.5 | 50,520 |
| Cassia Gulch | Wind | Twin Falls | 18.9 | 35,441 |
| Upper Salmon A | Hydro | Twin Falls | 18 | 92,637 |
| Tuana Springs | Wind | Twin Falls | 16.8 | 28,171 |
| Upper Salmon B | Hydro | Twin Falls | 16.5 | 89,116 |
| Raft River Geothermal Power Plant | Geothermal | Cassia | 16 | 88,141 |
| Simplot Leasing Don Plant | Other-fuel | Bannock | 15.9 | 66,124 |
| Arrowrock Hydroelectric Project | Hydro | Elmore | 15 | 63,209 |
| Shoshone Falls | Hydro | Jerome | 14.7 | 51,884 |
| Soda | Hydro | Caribou | 14.6 | 16,262 |
| Post Falls | Hydro | Kootenai | 14.5 | 60,420 |
| Lower Malad | Hydro | Gooding | 13.5 | 104,399 |
| Oregon Trail Wind Park | Wind | Twin Falls | 13.5 | 34,932 |
| Amalgamated Sugar Twin Falls | Natural gas | Twin Falls | 12.7 | 20,649 |
| Cascade Dam (ID) | Hydro | Valley | 12.4 | 40,321 |
| Golden Valley Wind Park LLC | Wind | Cassia | 12 | 27,933 |
| Thousand Springs Wind Park | Wind | Twin Falls | 12 | 28,641 |
| Fossil Gulch | Wind | Gooding | 10.5 | 20,654 |
| Pilgrim Stage Wind Park | Wind | Twin Falls | 10.5 | 30,108 |
| Tuana Gulch Wind Park | Wind | Twin Falls | 10.5 | 27,414 |
| Black Canyon | Hydro | Gem | 10.2 | 62,923 |
| Bypass | Hydro | Jerome | 9.9 | 28,241 |
| Horseshoe Bend Hydroelectric Co | Hydro | Boise | 9.4 | 46,810 |
| Magic Dam Hydroelectric Project | Hydro | Blaine | 9 | 9,819 |
| Falls River Hydro | Hydro | Fremont | 9 | 43,169 |
| S E Hazelton A | Hydro | Jerome | 8.7 | 24,868 |
| Wilson Lake Hydroelectric Project | Hydro | Jerome | 8.4 | 27,278 |
| Cassia Wind | Wind | Twin Falls | 8.4 | 17,815 |
| Upper Malad | Hydro | Gooding | 8.3 | 55,333 |
| Amalgamated Sugar LLC Nampa | Natural gas | Canyon | 8.2 | 46,771 |
| City Power Plant | Hydro | Bonneville | 8 | 39,627 |
| Upper Power Plant | Hydro | Bonneville | 8 | 44,780 |
| Lower No 1 | Hydro | Bonneville | 8 | 41,610 |
| South Forks Hydro | Hydro | Twin Falls | 8 | 26,341 |
| Hazelton B Hydro | Hydro | Jerome | 7.6 | 23,342 |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity is nameplate of operable generators. Ranks 51 to 100 run from 22.5 MW at Power County Wind Park South to 7.6 MW at Hazelton B Hydro.
| Plant | Fuel | County | MW | 2025 MWh |
|---|---|---|---|---|
| Felt | Hydro | Teton | 7.4 | 24,226 |
| Thousand Springs | Hydro | Gooding | 6.8 | 51,832 |
| Ashton | Hydro | Fremont | 6.7 | 28,012 |
| Tamarack Energy | Biomass | Adams | 6.2 | 14,096 |
| Plummer Cogen | Biomass | Benewah | 6.2 | n/a |
| BYUI Central Energy Facility | Natural gas | Madison | 5.6 | 39,608 |
| Salmon Diesel | Petroleum | Lemhi | 5 | 36 |
| Island Park | Hydro | Fremont | 4.8 | 9,684 |
| Dietrich Drop | Hydro | Lincoln | 4.8 | 11,887 |
| Barber Dam | Hydro | Ada | 4.1 | 6,669 |
| Elmore BESS | Battery and pumped storage | Elmore | 4 | -356 |
| Moyie Springs | Hydro | Boundary | 3.9 | 21,385 |
| Milner Butte LFGE | Biomass | Cassia | 3.9 | 26,669 |
| Dry Creek Project | Hydro | Butte | 3.6 | 7,764 |
| Chester Diversion Hydroelectric Project | Hydro | Fremont | 3.6 | 7,796 |
| Boise R Diversion | Hydro | Ada | 3.3 | 73 |
| Hidden Hollow Energy | Biomass | Ada | 3.2 | 2,789 |
| Fighting Creek LFGTE Plant | Biomass | Kootenai | 3.2 | 21,845 |
| Bannock County LFG to Energy | Biomass | Bannock | 3.2 | 12,710 |
| West Point RNG | Biomass | Gooding | 3.2 | 13,691 |
| Mink Creek Hydro | Hydro | Franklin | 3.1 | 8,653 |
| Lower No 2 | Hydro | Bonneville | 3 | 3,751 |
| Weiser BESS | Battery and pumped storage | Washington | 3 | -248 |
| Low Line Rapids | Hydro | Twin Falls | 2.8 | 8,318 |
| Little Wood Hydro Project | Hydro | Blaine | 2.8 | 2,414 |
| Birch Creek Power | Hydro | Clark | 2.6 | 10,352 |
| El Dorado Hydro Elk Creek | Hydro | Idaho | 2.6 | n/a |
| Clear Lake | Hydro | Gooding | 2.5 | 11,811 |
| Lateral 10 Ventures | Hydro | Twin Falls | 2.4 | 565 |
| Crystal Springs | Hydro | Twin Falls | 2.3 | 8,484 |
| MC6 Hydro Facility | Hydro | Ada | 2.3 | 8,364 |
| Cargill B6 Biofactory | Biomass | Gooding | 2.2 | 635 |
| Rock Creek I | Hydro | Twin Falls | 2.1 | 86 |
| Filer BESS | Battery and pumped storage | Twin Falls | 2 | -168 |
| Melba BESS | Battery and pumped storage | Canyon | 2 | -96 |
| Rock Creek II | Hydro | Twin Falls | 1.9 | n/a |
| Kettle Butte Digester, LLC | Biomass | Jefferson | 1.8 | 6,819 |
| Last Chance | Hydro | Caribou | 1.7 | 3,490 |
| Mora Drop Hydroelectric Project | Hydro | Ada | 1.7 | 4,601 |
| Marsh Valley Development | Hydro | Bannock | 1.6 | 3,509 |
| Big Sky Dairy Digester | Biomass | Gooding | 1.6 | 9,025 |
| Clif Bar Bakery of Twin Falls | Solar | Twin Falls | 1.6 | 2,558 |
| Little Mac Project | Hydro | Twin Falls | 1.5 | 4,274 |
| Mile 28 Water Power Project | Hydro | Jerome | 1.4 | 4,986 |
| Koyle Ranch Hydroelectric Project | Hydro | Gooding | 1.3 | 3,364 |
| Blind Canyon Hydro | Hydro | Gooding | 1.3 | 3,666 |
| North Gooding Main Hydro | Hydro | Gooding | 1.3 | 4,572 |
| Marco Ranch | Hydro | Jerome | 1.2 | 2,473 |
| Ford Hydro LP | Hydro | Clearwater | 1.2 | 3,055 |
| Head of U Canal Hydro Project | Hydro | Jerome | 1.2 | 4,605 |
| AJMS, LLC | Hydro | Lincoln | 1.2 | 3,372 |
| Fargo Drop | Hydro | Canyon | 1.1 | 3,757 |
| GeoBon II | Hydro | Lincoln | 1 | 54 |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity is nameplate of operable generators. Ranks 101 to 153 run from 7.4 MW at Felt to 1 MW at GeoBon II.
Which Idaho plants are not running?
8 more sites in Idaho have no operable generators in 2025: proposed projects, retired plants and sites still on file.
Show 8 sites without operable generators
| Site | County | Proposed | Retired |
|---|---|---|---|
| Blacks Creek Solar | Ada | 400 MW | n/a |
| Arco Wind and Solar Project | Bonneville | 359 MW | n/a |
| Crimson Orchard Solar and BESS | Elmore | 200 MW | n/a |
| Boise Bench BESS | Ada | 150 MW | n/a |
| Pleasant Valley Solar 2 Project | Ada | 125 MW | n/a |
| IFP Peaking Plant | Bonneville | 17.5 MW | n/a |
| Cove | Caribou | n/a | 7.5 MW |
| UAMPS Carbon Free Power Plant | Bonneville | n/a | n/a |
Source: EIA Form EIA-860, 2025 final.