Wind power plant, Idaho
Horse Butte Wind I, LLC power plant, Idaho
Horse Butte Wind I, LLC is a 57.6 MW wind power plant in Bonneville County, Idaho, operated by Utah Associated Mun Power Sys, and it generated 157,956 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.8% of the generation reported in Idaho, and its capacity factor sits at the 45th percentile of U.S. wind plants. By 2025 generation it ranks 2,820th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Horse Butte Wind I, LLC plant run compared with other wind plants?
The Horse Butte Wind I, LLC plant had a capacity factor of 31% in 2025 on 57.6 MW of net summer capacity, the 45th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 114 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Horse Butte Wind I, LLC | 31% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Horse Butte Wind I, LLC plant generating more or less than last year?
Generation at Horse Butte Wind I, LLC fell 5.6% from 2024 to 2025, from 167,388 MWh to 157,956 MWh.
| Period | MWh |
|---|---|
| 2024 | 167,388 |
| 2025 | 157,956 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 22,264 |
| November 2025 | 14,696 |
| October 2025 | 12,617 |
| September 2025 | 7,706 |
| August 2025 | 9,349 |
| July 2025 | 12,850 |
| June 2025 | 8,966 |
| May 2025 | 9,831 |
| April 2025 | 13,588 |
| March 2025 | 18,030 |
| February 2025 | 18,382 |
| January 2025 | 9,677 |
| December 2024 | 16,346 |
| November 2024 | 16,272 |
| October 2024 | 13,362 |
| September 2024 | 11,961 |
| August 2024 | 11,708 |
| July 2024 | 9,838 |
| June 2024 | 15,509 |
| May 2024 | 14,698 |
| April 2024 | 13,558 |
| March 2024 | 13,698 |
| February 2024 | 17,229 |
| January 2024 | 13,209 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Horse Butte Wind I, LLC plant, and when do they retire?
1 operable generator totals 57.6 MW, with an average age of 13 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 58 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 1 | Operating | Onshore Wind Turbine | 58 | 2012 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Horse Butte Wind I, LLC plant?
EIA lists no joint owners for Horse Butte Wind I, LLC. Utah Associated Mun Power Sys operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Horse Butte Wind I, LLC plant?
Horse Butte Wind I, LLC is in Iona, Bonneville County, Idaho, at 43.3864° N, 111.7264° W. It sits in the Bonneville Power Administration balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Idaho are similar in size?
Idaho has 33 operable wind plants with 1,132 MW of capacity, and Horse Butte Wind I, LLC's 57.6 MW is 5% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Rockland Wind Farm | Power | 79 | 219,376 |
| Wolverine Creek | Bonneville | 65 | 143,680 |
| Horse Butte Wind I, LLC | Bonneville | 58 | 157,956 |
| High Mesa | Twin Falls | 40 | 76,378 |
Source: EIA Forms EIA-860 and EIA-923, 2025.