Wind power plant, Idaho

High Mesa wind power plant, Idaho

High Mesa is a 40 MW wind power plant in Twin Falls County, Idaho, operated by High Mesa Energy, LLC, and it generated 76,378 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.4% of the generation reported in Idaho, and its capacity factor sits at the 14th percentile of U.S. wind plants. By 2025 generation it ranks 3,692nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

40 MWNameplate capacity
22%Capacity factor, 2025, 14th percentile, on 39.9 MW net summer
0.4%Of ID generation, 2025
13 yearsAverage generator age, by MW

How hard does the High Mesa plant run compared with other wind plants?

The High Mesa plant had a capacity factor of 22% in 2025 on 39.9 MW of net summer capacity, the 14th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 80 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
High Mesa22%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the High Mesa plant generating more or less than last year?

Generation at High Mesa fell 16.5% from 2024 to 2025, from 91,518 MWh to 76,378 MWh. Through August 2026 it is running 16.7% behind the same months of 2025.

Net generation by period
PeriodMWh
202491,518
202576,378
2026 through August45,070
2025, same months54,090
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 20264,063
July 20262,903
June 20267,244
May 20266,598
April 20267,909
March 20266,773
February 20265,742
January 20263,838
December 20256,000
November 20254,703
October 20257,138
September 20254,447
August 20254,326
July 20254,955
June 20255,986
May 20258,454
April 20256,782
March 20258,397
February 20258,413
January 20256,777
December 20247,917
November 20249,739
October 20246,263
September 20244,855
August 20245,031
July 20244,934
June 20246,730
May 202410,714
April 20249,454
March 20246,008
February 20248,908
January 202410,965

Source: EIA Form EIA-923, through August 2026.

How much of Idaho's electricity comes from the High Mesa plant?

High Mesa made 0.4% of the 20,276,280 MWh reported by Idaho plants in 2025, from 0.6% of the state's 6,431 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 33rd largest of 153 plants in Idaho, the 4,074th largest of 14,327 in the U.S. and the 922nd largest of 1,358 wind plants. By 2025 generation it is the 39th largest of 141 generating plants in the state.

High Mesa within Idaho, 2025
MeasureThis plantIdahoShare
Capacity (MW)406,4310.6%
Generation (MWh)76,37820,276,2800.4%
Wind capacity (MW)401,1323.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the High Mesa plant, and when do they retire?

1 operable generator totals 40 MW, with an average age of 13 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s140100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingOnshore Wind Turbine402012n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the High Mesa plant?

EIA lists no joint owners for High Mesa. High Mesa Energy, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the High Mesa plant?

High Mesa is in King Hill, Twin Falls County, Idaho, at 42.8800° N, 115.0367° W. It sits in the Idaho Power Company balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Idaho are similar in size?

Idaho has 33 operable wind plants with 1,132 MW of capacity, and High Mesa's 40 MW is 4% of that.

Wind plants in Idaho around this size
PlantCountyMW2025 MWh
Rockland Wind FarmPower79219,376
Wolverine CreekBonneville65143,680
Horse Butte Wind I, LLCBonneville58157,956
High MesaTwin Falls4076,378
Ryegrass WindfarmElmore2348,676
Hammett Hill WindfarmElmore2353,080
Mainline WindfarmElmore2352,218

Source: EIA Forms EIA-860 and EIA-923, 2025.