Skip to main content
RateWatt

Wind power plant, Idaho

Mainline Windfarm wind power plant, Idaho

Mainline Windfarm is a 23 MW wind power plant in Elmore County, Idaho, operated by Mountain Air Projects, LLC, and it generated 52,218 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in Idaho, and its capacity factor sits at the 25th percentile of U.S. wind plants. By 2025 generation it ranks 4,047th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

23 MWNameplate capacity
26%Capacity factor, 2025, 25th percentile, on 23 MW net summer
0.3%Of ID generation, 2025
13 yearsAverage generator age, by MW

How hard does the Mainline Windfarm plant run compared with other wind plants?

The Mainline Windfarm plant had a capacity factor of 26% in 2025 on 23 MW of net summer capacity, the 25th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 95 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Mainline Windfarm26%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Mainline Windfarm plant generating more or less than last year?

Generation at Mainline Windfarm fell 15.4% from 2024 to 2025, from 61,718 MWh to 52,218 MWh.

Net generation by period
PeriodMWh
202461,718
202552,218
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20253,902
November 20253,340
October 20255,006
September 20253,356
August 20253,474
July 20254,127
June 20254,360
May 20256,053
April 20254,468
March 20255,221
February 20255,129
January 20253,782
December 20244,316
November 20246,239
October 20244,398
September 20243,373
August 20243,976
July 20243,565
June 20244,718
May 20247,410
April 20246,997
March 20244,489
February 20245,645
January 20246,592

Source: EIA Form EIA-923, through August 2026.

How much of Idaho's electricity comes from the Mainline Windfarm plant?

Mainline Windfarm made 0.3% of the 20,276,280 MWh reported by Idaho plants in 2025, from 0.4% of the state's 6,431 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 44th largest of 153 plants in Idaho, the 4,644th largest of 14,327 in the U.S. and the 996th largest of 1,358 wind plants. By 2025 generation it is the 55th largest of 141 generating plants in the state.

Mainline Windfarm within Idaho, 2025
MeasureThis plantIdahoShare
Capacity (MW)236,4310.4%
Generation (MWh)52,21820,276,2800.3%
Wind capacity (MW)231,1322.0%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Mainline Windfarm plant, and when do they retire?

1 operable generator totals 23 MW, with an average age of 13 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s123100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingOnshore Wind Turbine232012n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Mainline Windfarm plant?

EIA lists no joint owners for Mainline Windfarm. Mountain Air Projects, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Mainline Windfarm plant?

Mainline Windfarm is in Glenns Ferry, Elmore County, Idaho, at 43.0483° N, 115.4129° W. It sits in the Idaho Power Company balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Idaho are similar in size?

Idaho has 33 operable wind plants with 1,132 MW of capacity, and Mainline Windfarm's 23 MW is 2% of that.

Wind plants in Idaho around this size
PlantCountyMW2025 MWh
High MesaTwin Falls4076,378
Ryegrass WindfarmElmore2348,676
Hammett Hill WindfarmElmore2353,080
Mainline WindfarmElmore2352,218
Desert Meadow WindfarmElmore2354,261
Cold Springs WindfarmElmore2346,612
Two Ponds WindfarmElmore2355,174

Source: EIA Forms EIA-860 and EIA-923, 2025.