Solar power plant, Idaho
Franklin Solar Hybrid power plant, Idaho
Franklin Solar Hybrid is a 100 MW solar power plant in Twin Falls County, Idaho, operated by Franklin Solar Idaho, and it generated 252,389 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.2% of the generation reported in Idaho, and its capacity factor sits at the 86th percentile of U.S. solar plants. By 2025 generation it ranks 2,219th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Franklin Solar Hybrid plant run compared with other solar plants?
The Franklin Solar Hybrid plant had a capacity factor of 29% in 2025 on 100 MW of net summer capacity, the 86th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 105 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Franklin Solar Hybrid | 29% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Franklin Solar Hybrid plant generating more or less than last year?
Franklin Solar Hybrid generated 252,389 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 5.6% behind the same months of 2025. 2024 has output for only 6 months, so the two years are not compared.
| Period | MWh |
|---|---|
| 2024 | 126,953 |
| 2025 | 252,389 |
| 2026 through August | 182,851 |
| 2025, same months | 193,732 |
Monthly generation, May 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 25,675 |
| July 2026 | 28,900 |
| June 2026 | 30,706 |
| May 2026 | 31,056 |
| April 2026 | 24,337 |
| March 2026 | 18,014 |
| February 2026 | 13,592 |
| January 2026 | 10,571 |
| December 2025 | 7,694 |
| November 2025 | 11,004 |
| October 2025 | 15,716 |
| September 2025 | 24,243 |
| August 2025 | 27,747 |
| July 2025 | 31,065 |
| June 2025 | 32,632 |
| May 2025 | 26,459 |
| April 2025 | 25,155 |
| March 2025 | 28,884 |
| February 2025 | 11,477 |
| January 2025 | 10,313 |
| December 2024 | 8,316 |
| November 2024 | 10,440 |
| September 2024 | 23,558 |
| August 2024 | 27,053 |
| July 2024 | 28,354 |
| June 2024 | 29,232 |
| May 2024 | 0 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Franklin Solar Hybrid plant, and when do they retire?
1 operable generator totals 100 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 100 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| FRKLN | Operating | Solar Photovoltaic | 100 | 2024 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Franklin Solar Hybrid plant?
EIA lists no joint owners for Franklin Solar Hybrid. Franklin Solar Idaho operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Franklin Solar Hybrid plant?
Franklin Solar Hybrid is in Twin Falls, Twin Falls County, Idaho, at 42.2042° N, 114.6099° W. It sits in the Idaho Power Company balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Idaho are similar in size?
Idaho has 13 operable solar plants with 702 MW of capacity, and Franklin Solar Hybrid's 100 MW is 14% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Matrix Pleasant Valley | Ada | 200 | 460,067 |
| Jackpot Solar, LLC | Twin Falls | 120 | 274,519 |
| Franklin Solar Hybrid | Twin Falls | 100 | 252,389 |
| Grand View Solar Two | Elmore | 80 | 183,722 |
Source: EIA Forms EIA-860 and EIA-923, 2025.