Minidoka hydroelectric power plant, Idaho
Minidoka is a 27.7 MW hydro power plant in Minidoka County, Idaho, operated by U S Bureau of Reclamation, and it generated 98,814 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.5% of the generation reported in Idaho, and its capacity factor sits at the 68th percentile of U.S. hydro plants. By 2025 generation it ranks 3,404th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Minidoka plant run compared with other hydro plants?
The Minidoka plant had a capacity factor of 41% in 2025 on 27.7 MW of net summer capacity, the 68th percentile of the 427 U.S. hydro plants with at least 20 MW. The typical hydro plant reached 33%. That equals about 149 days at full output out of 365.
0%Shaded: the middle half of hydro plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Minidoka | 41% |
| Hydro plants, 75th percentile | 44% |
| Hydro plants, median | 33% |
| Hydro plants, 25th percentile | 22% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Minidoka plant generating more or less than last year?
Generation at Minidoka fell 11.5% from 2024 to 2025, from 111,667 MWh to 98,814 MWh.
1 month shows net generation below zero, when the plant used more power than it sent out, so the months are listed below rather than charted.
| Period | MWh |
|---|---|
| 2024 | 111,667 |
| 2025 | 98,814 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 213 |
| November 2025 | -212 |
| October 2025 | 3,466 |
| September 2025 | 12,550 |
| August 2025 | 17,572 |
| July 2025 | 19,972 |
| June 2025 | 19,351 |
| May 2025 | 16,523 |
| April 2025 | 8,343 |
| March 2025 | 942 |
| February 2025 | 80 |
| January 2025 | 14 |
| December 2024 | 398 |
| November 2024 | 358 |
| October 2024 | 4,780 |
| September 2024 | 13,222 |
| August 2024 | 17,591 |
| July 2024 | 18,169 |
| June 2024 | 18,057 |
| May 2024 | 18,907 |
| April 2024 | 16,325 |
| March 2024 | 3,385 |
| February 2024 | 279 |
| January 2024 | 196 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Minidoka plant, and when do they retire?
4 operable generators total 27.7 MW, with an average age of 45 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 1920s | 1 | 3 | 10% | none reported |
| 1940s | 1 | 5 | 18% | none reported |
| 1990s | 2 | 20 | 72% | none reported |
Every generator, 4 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 6 | Operating | Conventional Hydroelectric | 3 | 1927 | n/a |
| 7 | Operating | Conventional Hydroelectric | 5 | 1942 | n/a |
| 8 | Operating | Conventional Hydroelectric | 10 | 1997 | n/a |
| 9 | Operating | Conventional Hydroelectric | 10 | 1997 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Minidoka plant?
EIA lists no joint owners for Minidoka. U S Bureau of Reclamation operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Minidoka plant?
Minidoka is in Rupert, Minidoka County, Idaho, at 42.6699° N, 113.4832° W. It sits in the Bonneville Power Administration balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which hydro plants in Idaho are similar in size?
Idaho has 76 operable hydro plants with 2,696 MW of capacity, and Minidoka's 27.7 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Smith Falls Hydro Project | Boundary | 38 | 87,180 |
| Grace | Caribou | 33 | 82,687 |
| Oneida | Franklin | 30 | 39,401 |
| Minidoka | Minidoka | 28 | 98,814 |
| Swan Falls | Ada | 27 | 110,047 |
| Gem State | Bonneville | 23 | 117,220 |
| Upper Salmon A | Twin Falls | 18 | 92,637 |