Marengo Wind Plant, Washington

Marengo Wind Plant is a 234 MW wind power plant in Columbia County, Washington, operated by PacifiCorp, and it generated 612,625 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.6% of the generation reported in Washington, and its capacity factor sits at the 38th percentile of U.S. wind plants. By 2025 generation it ranks 1,108th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

234 MWNameplate capacity
30%Capacity factor, 2025, 38th percentile, on 234 MW net summer
0.6%Of WA generation, 2025
18 yearsAverage generator age, by MW

How hard does Marengo Wind Plant run compared with other wind plants?

Marengo Wind Plant had a capacity factor of 30% in 2025 on 234 MW of net summer capacity, the 38th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 109 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Marengo Wind Plant30%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is Marengo Wind Plant generating more or less than last year?

Generation at Marengo Wind Plant fell 11.6% from 2024 to 2025, from 692,749 MWh to 612,625 MWh.

Net generation by period
PeriodMWh
2024692,749
2025612,625
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202573,627
November 202543,912
October 202544,722
September 202527,103
August 202540,891
July 202552,239
June 202558,719
May 202562,343
April 202563,062
March 202574,877
February 202540,574
January 202530,556
December 202454,144
November 202469,205
October 202452,570
September 202450,285
August 202435,427
July 202447,772
June 202462,225
May 202487,580
April 202474,574
March 202457,083
February 202452,726
January 202449,158

Source: EIA Form EIA-923, through August 2026.

How much of Washington's electricity comes from Marengo Wind Plant?

Marengo Wind Plant made 0.6% of the 101,512,862 MWh reported by Washington plants in 2025, from 0.7% of the state's 31,712 MW of capacity. By capacity it is the 30th largest of 139 plants in Washington, the 1,351st largest of 14,327 in the U.S. and the 173rd largest of 1,358 wind plants. By 2025 generation it is the 28th largest of 129 generating plants in the state.

Marengo Wind Plant within Washington, 2025
MeasureThis plantWashingtonShare
Capacity (MW)23431,7120.7%
Generation (MWh)612,625101,512,8620.6%
Wind capacity (MW)2343,3876.9%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at Marengo Wind Plant, and when do they retire?

2 operable generators total 234 MW, with an average age of 18 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s2234100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingOnshore Wind Turbine1562007n/a
2OperatingOnshore Wind Turbine782008n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns Marengo Wind Plant?

EIA lists no joint owners for Marengo Wind Plant. PacifiCorp operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does PacifiCorp charge homes?

PacifiCorp, the operator of Marengo Wind Plant, had an average residential price of 14.33¢ per kWh and an average bill of $167 a month in 2025, 9% above the Washington average of 13.17¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Washington
PacifiCorp14.33¢$1679% higher
Washington average13.17¢$124
U.S. average17.23¢$15131% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is Marengo Wind Plant?

Marengo Wind Plant is in Dayton, Columbia County, Washington, at 46.3747° N, 117.7772° W. It sits in the PacifiCorp - West balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Washington are similar in size?

Washington has 23 operable wind plants with 3,387 MW of capacity, and Marengo Wind Plant's 234 MW is 7% of that.

Wind plants in Washington around this size
PlantCountyMW2025 MWh
Wild HorseKittitas273590,306
Tucannon River Wind FarmColumbia267736,786
Windy Flats Wind ProjectKlickitat262650,866
Marengo Wind PlantColumbia234612,625
White Creek Wind FarmKlickitat204536,031
Big Horn Wind ProjectKlickitat199475,549
FPL Energy Vansycle LLC (WA)Walla Walla177249,731

Source: EIA Forms EIA-860 and EIA-923, 2025.